24.Attach the front panel. Remove the 2 front panel screws from unit base. Replace front panel by pushing it straight on and then lowering it slightly to lock it in place. Attach bottom front of panel by reinserting the 2 front panel screws.
Through-the-wall installation
It is the consumer’s responsibility and obligation to have this product installed by a qualified technician who is familiar with
1.Cut an opening through the wail. Re- move any insulation and keep for Step 8.
2.Measure depth of wail opening and construct finish frame. Use 1” (25 mm) or heavier lumber for wood frame con- struction. When using a wood, metal, or plastic molding, the finish frame should line up with the inside wall. If a plastered wall is to be flush with the cabinet, and no molding is used, the finish frame must be set %” (13 mm) back from the finished plaster surface. See illustrations at right for frame construction and brick veneer construction information.
Finish frame measurements include: A - Wall opening width
B - Wall opening height
C - Depends on wall thickness and type of molding
NOTE: Apply wood preservative to the surface exposed to the outside.
continued on next page