
The Next Step ERX Edge Routers
Verifying the Installation
To verify that the installation is complete:
1Turn on the power switches.
The system will reboot.
2Issue the show redundancy command, and verify that the display shows the redundancy hardware.
The Next Step
After you have installed the modules and are confident that they sit correctly in their respective chassis slots, you are ready to connect cables. For instructions on installing cables for your ERX system, see Chapter 4, Cabling the ERX System.