4
Index
installing spare 3-15 LEDs 1-7, 8-2, 8-3 to 8-9 models B-7 to B-21 performance rate 1-2, 1-4 performance specifications B-4 to B-6 power use B-4 to B-6
redundancy 1-13, 3-14 to 3-17, 8-9 removing 3-13
slot groups 3-2 to 3-4 uplink 1-7
linking to an FTP server. See FTP access LINK LED 8-4
lline modules redundancy B-4 to B-6
location, for ERX system D-2loss of frame synchronization 8-5
M
maintenance, system 7-1 management access 1-11, 5-1 to 5-6
setting up console 5-2 to 5-4 SNMP 1-11, 5-6
Telnet setup 5-4 Management Information Bases 1-11 managing modules 3-4
manuals, Juniper Networks xvii comments on xix
on CD xviii
mechanical requirements for distribution rack D-3 MIBs (Management Information Bases) 1-11 midplane 1-7, 3-12
models, ERX xv modules
descriptions B-1 to B-4 failure. See troubleshooting hot-swapping 3-4 installing 3-6 to 3-12
order of installation 3-5 precautions necessary 3-6
managing 3-4 ports 4-2 removing 3-13 to 3-14 repairing and replacing 3-6 replacing 3-4
self-testing 8-3 storing 7-2
See also I/O modules; line modules; SRP modules
monitoring
LEDs 8-3 to 8-9 temperature 8-10
mounting a CD on an FTP server E-4,E-10,E-13
mounting posts for rack D-3
N
network management | 1-11, 5-1 to 5-6 |
setting up console | 5-2 to 5-4 |
SNMP 1-11, 5-6 | |
Telnet setup 5-4
NMC-RX Device Management System 1-11 notice icons defined xvi
NVS cards
installing 7-2 to 7-5storing 7-2
O
OK LED 8-3 ONLINE LED 8-3
operating environment. See environmental requirements
order of module installation 3-5
P
packet classification 1-10 PCMCIA slot, SRP modules 1-8 performance rate, line modules 1-2, 1-4 pinouts, ERX cables and connectors C-1 planning site for installation D-1 to D-7 plenum 2-6
ports
alarm 4-7 console 4-7 external timing 4-7 module 4-2, B-7 to B-21 redundancy B-4 to B-6
positioning ERX system 2-1 power
cabling power input module 4-4 to 4-6 consumption
line modules B-4 to B-6 SRP modules B-6 system A-2
dissipation A-1 failures 8-2, 8-8 redundancy 1-14