OUTER TUB ASSEMBLY
The outer tub assembly is suspended from two springs positioned toward the upper front of the cabinet and supported in the rear by two struts which are secured to the base frame. Two counter weights are mounted to the outer tub from above and below the tub. The alu- minum bearing housing retains both inner and outer bearings for the spinner tub support shafts.
Front
Water
Flume
Upper
Weight
Displacement
Switch
Figure
REMOVAL OF UPPER WEIGHT
1.Disconnect power to the unit.
2.Lift top cover (See Top Cover).
3.Remove the two ½" counter balance bolts securing the weight to the top of the outer tub assembly.
NOTE: The bolts screw into two nuts below the weight, under the tub mounting pad (Fig- ure
Counter
Balance
Bolt
Upper
Weight
Nut
Figure
REMOVAL OF LOWER FRONT WEIGHT
1.Remove the front panel (See Front Panel).
2.Remove the two bolts securing the weight to the outer tub assembly. Use a 9/16" socket (Figure
BEARINGS
The bearings are not repairable or replaceable. Replacement of the complete outer tub as- sembly is required.
3.Lower the front weight and guard against hitting the motor control microprocessor board mounted to the base assembly.
COUNTER WEIGHTS
Two counter weights are secured to the outer tub assembly. One is secured to the top of the tub assembly and the other is secured to the bottom of the tub assembly.
Front
Weight
Strap
Counter Balance Bolt
| Figure |
|
SECTION 7. OUTER TUB & SPINNER ASSEMBLY | ||
| © 1998 Maytag Corporation |
|