Windsor LB2000 manual Operation, Controls, Daily Maintenance, Pad Installation

Models: LB2000

1 28
Download 28 pages 21.74 Kb
Page 10
Image 10
OPERATION

OPERATION

CONTROLS

1.Safety Lock – Prevents unintended operation of the machine.

2.Switch Levers – Turns machine on/off.

1

22

OPERATION

CONTROLSDAILY MAINTENANCE!PAD INSTALLATION CAUTION For indoor use only.

Manual backgroundManual background!

When using the pad, always keep the machine moving when in contact with the floor.

Manual backgroundManual background!

High starting torque. Hold machine firmly with both hands.

1.Ensure that the pad driver is in good shape. Install or change pad if necessary.

2.Plug the machine into a wall outlet as described in the grounding instructions.

3.Release latch, lower the handle and move into position.

4.Push the safety lock forward, unlocking the switch levers.

5.With the safety lock forward, squeeze one or both of the switch levers, turning the machine on. (These levers can be operated independently of each other). The safety lock will not re-engage until both levers are released.

6.To stop the machine, release the switch levers.

7.Do not let machine rest on pad. When finished with the machine, return handle to the storage position.

NOTE: The machine is equipped with a circuit breaker to protect the motor in the event an overload condition occurs. The circuit breaker is located on the side of the motor. Push the reset button to restart the machine. If the breaker trips again, correct the cause of overloading before proceeding.

DAILY MAINTENANCE

1.Inspect power cord for wear. To prevent electrical shock replace cords with frayed or cracked insulation immediately.

2.Place machine in the storage position.

3.Check pad condition. Change if soiled or torn.

PAD INSTALLATION

1. Lay machine back, exposing the under side.

Ensure pad is center on pad driver. Pull pad to edge of pad driver in several directions to check for proper engagement.

NOTE: Use care when replacing center lock to prevent cross threading.

HANDLE

RELEASE LATCH

3-3

LB2000 980088 03/08/03

Page 10
Image 10
Windsor LB2000 manual Operation, Controls, Daily Maintenance, Pad Installation