1.Fill CV double yokes with 20 pumps of grease with the joints in a straight line.

2.Articulate CV body to maximum angle several times to ensure full coverage of joints.

3.Place joints in the straight position and add 10 additional pumps of grease to both joints.

4.Wipe telescoping drive clean of all old grease and contaminants.

5.Add a thin layer of new grease over telescoping drive.

REF

DESCRIPTION

FREQUENCY

1.

Driveline U-Joints

8 Hours

2.

Telescoping Shaft

8 Hours

3.

CV Body

8 Hours

4.

Shield Bearing

8 Hours

5.

Splitter Gearbox (Fill 1/2

Check

 

full w/SAE 90W gear lube Daily

6.

Rear Deck Pivot Arm

8 Hours

7.

Transport Wheel Hub

8 Hours

Figure 2. Trailer Lubrication Points

REF

DESCRIPTION

FREQUENCY

1.

Driveline U-Joints

8 Hours

2.

Telescoping Shaft

8 Hours

3.

Shield Bearing

8 Hours

4.

Gearbox (Fill 1/2

Check

 

full w/SAE 90W gear lube Daily

5.

Caster Wheel Hubs

8 Hours

6.

Caster Pivots

8 Hours

7.

Blade Spindles

40 Hours

8.

Wing Pivot

8 Hours

9.

Deck Pivot

8 Hours

 

 

 

Figure 3. Deck Lubrication Points

MAN0765 (12/5/2008)

Owner Service 19

 

 

Page 19
Image 19
Woods Equipment TBW150C manual Description Frequency