Speed.Changes
To.change.the.drilling.speed,.do.these.steps:
1... UNPLUG.THE.DRILL.PRESS!
2.. Loosenthebelttensionlockknobsonthe
sideoftheheadstock(seeFigure.35).
3. Locatethedesiredspeedonthechartand
movetheV-belttothedesiredV-grooves
onthemotorandspindlepulleys(see
Figure.36).
4.. Pushthemotorinward,andmovetheV-
belt to the right spot.
5.. Push the motor toward the back of the
headstock. The motor support rod is spring
loaded and will follow the motor. Tighten
the lock knob when the right tension is
achieved.
6. Close the cover.
UNPLUG. the. drill. press.
before. changing. speeds.
to.avoid. accidental.start.
up..Failure.to.do.this.may.
result.in.serious.personal.
injury.
TheModelW1669andW1670RadialDrillPress
has5speedsrangingfrom550to3470 RPM.
To find your needed drilling speed and pulley
combination, refer to the speed chart located
underthebeltguard;orgoto.Page. 22 and
refer to the Drill.Press.RPM.Chart.
Figure.35..Looseninglockknob.
Figure.36..Adjustingbelttodesiredspeed.
Never.operate.drill.press.
with. belt. cover. in. the.
open.position..Your.hand.
may.become.trapped.in.a.
belt.and.serious.personal.
injury.will.occur.

Pushrod

OPERATIONS
-21-