AE01172
CONNECTION
Alternating Current (AC)
cC
9Be sure all electric devices including the lines and plug connections are in good condition before connection to the generator.
9Be sure any electric devices are turned off before plugging it in.
9Be sure the total load is within generator rated output.
9Be sure the receptacle load current is within receptacle rated current.
1.Wind the power lead 2 or 3 turns around handle.
2.Start the engine.
3.Plug in to the AC receptacle.
q | 4. | Make sure the AC pilot light is on. |
|
| |
| 1 AC pilot light | |
| 5. | Turn on any electric devices. |
|
|
– 15 –