251934-YTG-J-0910
1.The 2” space between the ducts allows for “jumping” an existing roof joist.
2.The
NOTE: Ducts can be installed into the curb from the roof. All electrical and gas line connections can be made inside the curb.
ZJ/ZR/ZF180-300 Typical Installation
Roof Jack
Installation
Roof Curb
Installation
Slab On
Ground
Installation