"ALTERNATE” MODE

When the room thermostat calls for second stage cooling, the RCB senses a signal through "Y1" & "Y2" and engages circuit #1 and circuit #2 in cooling mode.

Indoor blower operation is initiated upon a call for first stage cooling, second stage cooling or dehumidification.

Anytime there is a call for 2 stages of cooling, the unit will not operate in the reheat mode, even if there is a call for dehu- midification at "HUM".

The unit will not operate in the reheat mode if there is any call for heating.

On units with economizers, the unit will not operate in the reheat mode if there is a call for cooling and the economizer is operating as first stage of cooling.

All safety devices function as previously described.

"ALTERNATE” MODE

When the RCB detects a need for dehumidification (24VAC) at "HUM" via the field supplied dehumidistat connected to RHTB-1 and RHTB-2, and there is not a call for cooling, it energizes the HGR, which energizes the SOL 3, SOL 2, and de-energizes SOL 1. (In the DR150, SOL 2 is only energized when the discharge pressure in circuit #1 rises above 235 psig and de-energizes SOL 2 after the discharge pressure

R

Y1

Y2

G

W1

W2

OCC

C

COM

`

P6

 

P5

HGR HUM

MODE

SELECTION

JUMPER

246721-YTG-C-0606

falls below 175 psig. Both outdoor fans of circuit #1 in the DR150 also disengage to conserve energy.) The unit then operates with circuit #1 in reheat mode and circuit #2 in cool- ing mode.

When the room thermostat calls for first stage cooling while there is still a call for dehumidification, no operational change is made. The call for cooling is ignored and the unit continues to operate with circuit #1 in reheat mode and circuit #2 in cooling mode.

When the room thermostat calls for second stage cooling, the RCB senses a signal through "Y1" and "Y2" and de-ener- gizes the HGR, which de-energizes SOL 3 and SOL 2, and energizes SOL 1. Both circuits operate in the cooling mode.

Indoor blower operation is initiated upon a call for first stage cooling, second stage cooling or dehumidification.

Anytime there is a call for 2 stages of cooling, the unit will not operate in the reheat mode, even if there is still a call for dehumidification at "HUM".

The unit will not operate in the reheat mode if there is any call for heating.

All safety devices function as previously described.

P4

K1

K2

K4

K3

P3

FIGURE 3 - REHEAT CONTROL BOARD HGRR

DEHUMIDISTAT

HARNESS

CONNECTION

FIGURE 3 - REHEAT CONTROL BOARD

10

Unitary Products Group

Page 10
Image 10
York DR090, DR120, DR150 manual Reheat Control Board, Alternate” Mode, YTG-C-0606