York SVY48 THRU 60, AVY24 THRU 60 specifications Two-Stage Cooling Wiring, Typical Applications

Models: AVY24 THRU 60 SVY48 THRU 60

1 10
Download 10 pages 14.94 Kb
Page 10
Image 10
TWO-STAGE COOLING WIRING

TWO-STAGE COOLING WIRING

CONTROL WIRING - Air Handler & New UPG HP Systems

Two Stage H/P with York Guard VI Board & Copeland “Ultra Tech”

Conventional Application - Not Hot Heat Pump

 

 

 

AIR HANDLER

 

 

2 - STAGE SCROLL

THERMOSTAT

 

BOARD

 

 

HEAT PUMP

 

 

 

 

 

 

 

 

 

 

 

 

R

 

 

R

 

 

 

 

R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Y2

 

 

 

 

 

 

 

Y2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Y / Y2

 

 

 

 

Y2 OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Y1

 

 

Y1

 

 

 

 

Y1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W2

 

 

 

 

W2 OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

W1

 

 

 

 

W1 OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W

 

 

 

 

 

 

 

W

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

O

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HUM

 

HUMIDISTAT *

 

BS

 

 

 

 

 

 

 

 

 

X / L

 

 

X / L

 

 

 

 

X / L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

COM

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Optional dehumidification humidistat switch contacts open on humidity rise.

NOTES:

1.“Y/Y2” Terminal on air handler control board must be connected for full CFM and applications requiring 60 second blower off delay for SEER enhancement.

2.Remove humidistat jumper on air handler control board.

3.For heat pump applications - set MODE jumper on air handler control board to the HP position.

4.To change quantity of heat during HP defrost cycle - reverse connections at W1 and W2 on air handler control board.

TYPICAL APPLICATIONS

HORIZONTAL RIGHT

UPFLOW

DOWNFLOW

HORIZONTAL LEFT

Subject to change without notice. Printed in U.S.A.

256819-YTG-J-1208

Copyright © 2008 by Johnson Controls, Inc. All rights reserved.

Supersedes: 256819-YTG-I-0808

Johnson Controls Unitary Products

5005 York Drive

Norman, OK 73069

Page 10
Image 10
York SVY48 THRU 60 Two-Stage Cooling Wiring, Typical Applications, CONTROL WIRING - Air Handler & New UPG HP Systems