York YUHC 18-60, YUHC 07-18 owner manual Yukc, Install the main body, English

Models: YUHC 18-60 YUHC 07-18

1 23
Download 23 pages 11.11 Kb
Page 11
Image 11
Install the main body:

YUKC 18-48

The positioning of ceiling hole and indoor unit and hanging screw bolt:

 

Air outlet

 

 

Hanging Screw bolt

Main body : A

N-Ø200

70

 

 

4-M10 Site configuration

 

 

 

Distance between bolts: B

 

 

 

 

 

 

 

J=MxK

 

H

 

 

-640 175 115

 

 

60

80

440

 

 

 

 

 

 

 

5

C

Ceiling hole: D

Panel: E

Install the main body:

300

Main body: 800

 

 

 

720

 

Connecting point of

 

630

 

160

440

 

refrigerant pipe

 

(Liquid side ØG)

120

 

100

 

 

Connecting point of

285

 

298

refrigerant pipe

 

 

 

(Gas side ØF)

 

 

30

 

335

 

 

 

Dust proof net

 

 

 

(Additional purchase)

Connecting point of drain pipe

 

450

Canvas air passage

 

 

(Additional purchase)

 

 

Ceiling hole 470

 

 

 

Panel 500

Panel

(Additional purchase)

 

Capacity (Btu/h)

A

B

C

D

E

F

G

H

I

J

K

M

N

12000-18000

1082

1052

1115

1087

1408

12.7

6.35

24000

16

9.53

 

 

 

 

 

 

 

 

 

 

 

30000-48000

1350

1400

1380

1400

1430

19

12.7

252

35

930

310

3

4

ENGLISH 11

J368-EN.indd 11

2/1/07 9:41:11 AM

Page 11
Image 11
York YUHC 18-60, YUHC 07-18 owner manual Yukc, Install the main body, English