5. Set up
(Note that this is a
SE10
(1) Bar
(2) Holder B
(3) Holder A
2.Attach the cover (SE11,(11)) and fix it with screw.
3.Insert blade between cutter holder A and cutter holder B. (SE11)
4.Attach cover and spring washer. (SE11)
5.Screw the bolt to fix them into place. (SE11)
Tightening torque:
14.7~19.6
■LINE HEAD (SE11) (SE13)
IMPORTANT
Since the resistance of the nylon cutter is larger than that of the metal cutter, wrong operation of the nylon cutter will cause the clutch to overheat, deform and be damaged. When using the nylon cutter, carefully note the following.
•Use ZENOAH’s genuine nylon cutter. When using a
•Make sure that the length of the nylon cord is 17 cm or shorter.
•Keep the engine rotating at high speed while working.
1. | Detach bolt (1), spring washer (2), washer(3), bolt |
| cover (4) and cover (11). |
2. | Put holder B (5) to holder A (9). |
| Screw arbor bolt (12) in holder B (5). |
SE11
IMPORTANT
(1)Bolt
(2)Spring Washer
(3)Washer
(4)Bolt cover
(5)Holder B
(6)Blade
(7)Gear shaft
(8)Bar
(9)Holder A
(10)Gear case
(11)Cover preventing grass from getting caught up
3. Then attach the cutting head to the gear shaft over |
the holders. |
SE13
(1) Arbor bolt
(2) Holder B
(3) Holder A
Look at the blade from above, and make sure that the direction in which the blade is mounted is correct. (SE12)
SE12
(1) Rotating direction
11