Zephyr AK7500ASX, AK7536ASX, AK7548ASX manual Installation CBI-600B Horizontal Ducting Conversion

Models: AK7500ASX AK7548ASX AK7536ASX

1 22
Download 22 pages 3.51 Kb
Page 15
Image 15

6.Attach 6” round to rectangular transition adapter to hood with (4) M4x8 screws.

8.Place blower into round end of 6” round transition adapter. Attach brackets on blower to blower plate with (4) 3.5x8 screws. (2) screws for each bracket.

7.Attach blower brackets to blower with

(4) 10x3/16” screws. (2) screws for each bracket.

9.Attach rectangular starting collar to hood using the (6) screws removed from the rectangular cap in step 4.

Installation – CBI-600B Horizontal Ducting Conversion

13

Page 15
Image 15
Zephyr AK7500ASX, AK7536ASX, AK7548ASX manual Installation CBI-600B Horizontal Ducting Conversion