www.zephyronline.com

Installation – CBI-600B Horizontal Ducting Conversion

HORIZONTAL DUCTING IS ONLY AVAILABLE IF USING THE

CBI-600B SINGLE INTERNAL BLOWER.

1. Unscrew (4) screws holding blower to plate and

2. Cover round blower opening on blower plate

remove blower.

with 6” round metal cap included with the

 

CBI-600B. Secure with (3) 3.5x8 screws.

3. Follow instructions on previous page and install

 

blower plate into hood.

 

4. On the back of the hood, remove the (6) screws

5. Place round to rectangular transition adapter

holding the rectangular cap to the hood.

inside hood.

12

Page 14
Image 14
Zephyr AK7548ASX, AK7500ASX, AK7536ASX manual Installation CBI-600B Horizontal Ducting Conversion