![the Power Pack](/images/new-backgrounds/77072/7707223x1.webp)
the Power Pack
!
CAUTION: At least two installers are required due to the weight and size of the hood.
1. | Install blower into Power Pack |
| AK8200AS - Blower is |
| AK8300ASX - Refer to page 11 for instructions |
| Remove support screw from top of Power Pack |
| before installing into cabinet. FIG 2b |
2. | Install 8” round adapter to top of Power Pack. See page 11, step 3 |
| for instuctions. |
3. | Install optional AK08xxAS Stainless Steel Liner. Review manual |
www.zephyronline.com
AK8200AS | AK8300ASX | |
26 1/16” | - 34 11/16” | |
| C/L | |
3/4” | C/L | |
14 | ||
|
cabinet bottom
FIG 1
Installing
| included with liner for more details. |
4. | If no liner is used cut out an opening in the bottom of the cabinet by |
| following the dimensions in FIG 1. |
5. | Lift Power Pack into opening and secure to bottom of cabinet using |
minimum
3/4” wood base
Ductwork
elec.
Front View
Installation –
(4) M4 stainless steel screws, (1) in each corner; see FIG 2. note: Wood blocking may need to be added to cabinet base if additional support is needed.
6.Install duct work and seal with duct tape.
7.Install electrical.
8.Remove all packing materials before using Power Pack. Switch power on and check for leaks around duct tape.
9.Install baffle fi lters
metal or other non | (4) M4 ss wood screws |
combustible material | (1) in each corner |
FIG 2
remove support screw
FIG 2b
10