Zephyr AK8200AS Remote Blower Preparation, Installation, A Ground wire screw, location inside

Models: AK8300ASX AK8200AS

1 22
Download 22 pages 18.99 Kb
Page 14
Image 14
– Remote Blower Preparation

www.zephyronline.com

Remote Blower Preparation

B

1. Place 8” round adapter on top of power pack

2. Install threaded end of remote blower wiring

and secure with (4) M4x8 screws. Connect 8”

through external blower wiring knock out (B)

round duct work to 8” round adapter.

located in junction box on top of power pack.

InstallationA: Ground wire screw B

Installation

3.Place cap over threaded end of remote blower wiring and secure by turning clockwise.

4.Connect 6 pin male connector from blower wiring to 6 pin female connector in the power pack. (plug is located inside the power pack protruding from the white control board box).

A: Ground wire screw

A

location (inside)

 

5.Secure green ground wire from remote blower wiring to ground screw located inside the power pack

CBE-1000 / PBN-1000A: WIRING DIAGRAM

Remote Blower

White (common)

Black (high)

Wiring Box

Blue (med)

(hood)

Red (low)

 

Green (ground)

Junction Box

(Remote Blower)

NOTE: For instructions on installing remote blowers, please refer to the CBE-1000 or PBN-1000A manuals included in the blower packaging and on our website: www.zephyronline.com

12

Page 14
Image 14
Zephyr AK8200AS, AK8300ASX manual Remote Blower Preparation, Installation, A Ground wire screw, location inside