Zephyr ATI-M90ASX, ATI-M90ABX Installation - External & In-Line Blower Preparation

Models: ATI-M90ASX ATI-M90ABX

1 22
Download 22 pages 60.82 Kb
Page 13
Image 13
For internal blower instructions please turn to page 10.

Installation - External & In-Line Blower Preparation NOTE! The device in this version (with external motor) is equipped for rear discharge of exhaust air. However, if required, it is possible to have the exhaust air discharged from the top. This can be accomplished by carrying out the steps indicated in the follow- ing paragraphs; upon reaching step 7, the motor plate must be rotated and installed in the opposite direction.

Manual background The following instructions are for preparing the hood for use with an ex- ternal or in-line blowers models CBE-1000 or PBN-1000A.

CAUTION: To reduce the risk of fire and electric shock, install this rangehood only with remote blowers rated maximum 6.2 A.

For internal blower instructions please turn to page 10.

1. Open the front panel. Fig.1

NOTE! Open the front panel while holding it by its external sides, as shown in Fig.1 , and keep at a suitable distance to avoid impacting it.

2. Remove the Decorative Mesh Filters.

3. Loosen the two screws inside the hood that fasten the canopy. Fig.2

4. Slide the top cover off by lifting it. Fig.3

Installation - External & In-Line Blower Preparation

- 13 -

Page 13
Image 13
Zephyr ATI-M90ASX, ATI-M90ABX installation instructions Installation - External & In-Line Blower Preparation