Zephyr ATI-M90ABX, ATI-M90ASX Installation - External & In-Line Blower Preparation

Models: ATI-M90ASX ATI-M90ABX

1 22
Download 22 pages 60.82 Kb
Page 14
Image 14
Installation - External & In-Line Blower Preparation

www.zephyronline.com

Installation - External & In-Line Blower Preparation

5. Close the front panel while holding it by its external sides until it shuts.

6. Remove the metal motor plate by striking it with the aid of a slotted screwdriver. Fig. 4

7 . Remove the (10) screws securing the blo- wer plate to the blower housing and re- move blower plate. See Fig.5

8. (if air is discharged from the top, rotate the motor plate by 90° and fix the rectan- gular plate and the fixing bracket in the opposite direction.)

Install the chosen flange: rectangular (A) or circular (B), and fix it to the blower pla- te with the (4 type B)

screws. Fig. 6

9. Install the plate with the flange facing the wall, inside the motor casing: carry out the in- structions at stage 7 in reverse order then use the screws provided to complete installation. (Tot. 16 type B) Fig.7

10. Insert the female connector in the termi- nal box. Fig. 8A. Break the hood grommet with the aid of a slotted screwdriver Fig. 8B. Secure remote blower junction box to top of blower housing using (2) screws. See Fig.9

11. Connect the power supply conduit to

the box once the hood has been fixed to the wall (pag.17) . Fig. 10

- 14 -

Page 14
Image 14
Zephyr ATI-M90ABX, ATI-M90ASX installation instructions Installation - External & In-Line Blower Preparation