Installation

22.Install duct cover with 2 screws first on duct cover support bracket, then slide the duct lower section towards the bottom.

23.Fit control ball with its molex plug on its housing and twist in place.

a

b

˜ 15°

c

OK!

24.Perform connection between plates from control ball and from electronic box.

25.Fold all cables and plate so to avoid any damage when sliding the lower duct cover towards the bottom.

26 Fix lower duct cover to canopy with 2 screws.

Duct cover support bracket

TOP

VIEW

Upper

Duct coverduct cover support bracket

Plate from electronic box

 

 

Control Ball

Lower

 

duct cover

Housing

Control Ball

Note! consider this drawings as installation aid, dimensions are not respected.

27.Check all light bulbs to make sure they are secure in their sockets.

Turn power on in service panel. Check lights and blower operation.

If range hood does not operate:

Check that the circuit breaker is not tripped or the house fuse blown.

Disconnect power supply. Check that wiring is correct.