Zephyr ESL-M90AS manual Installation, Rear View

Models: ESL-M90AS

1 23
Download 23 pages 41.97 Kb
Page 11
Image 11
Installation

www.zephyronline.com

10.Determine the required height for the conduit and cut a 1-1/4" (3.2 cm) hole at this location.

Run wires through hole according the National Electrical Code or CSA Standards and local codes and ordinances.

There must be enough power supply cable from the fused disconnect (or circuit breaker) box to make the connection in the hood’s Junction box/es.

Use caulking to seal all openings.

Do Not turn on power until installation is completed.

11.Remark center line and hood bottom on same location as before and tape template on wall as in step 4 above.

12.Mount the lower support bracket with wood screws (supplied in mounting hardware kit) on locations marked on template, then remove template.

13.Install duct cover support bracket to wall flush to ceiling with drywall anchors supplied (the duct cover support bracket should be installed about 1/8“ (3mm) away from the ceiling).

For Ductless (recirculating) installations

Install the deflector (available as an extra kit) under the duct cover support bracket.

14. If supplied dismounted for shipping, assemble

Installation

the lower part of the hood with the integral

 

ventilator housing:

 

a. Remove the grease filter (see also Care &

 

Use section - Charcoal filter).

 

b. Rest the integral ventilator housing on a flat

 

surface and thread completely the lower part

 

of the hood onto it.

 

REAR VIEW

c.Make lamps connections.

11

Page 11
Image 11
Zephyr ESL-M90AS manual Installation, Rear View