Kobe Range Hoods CH0330SQB Wall Mount Installation, Hood Preparation before Installation

Models: CH0330SQB CH0348SQB

1 134
Download 134 pages 34.25 Kb
Page 11
Image 11
WALL MOUNT INSTALLATION

WALL MOUNT INSTALLATION

***This installation only applied with the purchase of an optional duct cover:

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

￿Decide the location of the venting pipe from the hood to the outside. Refer to Figure 9.

￿A straight, short venting run will allow the hood to perform more efficiently.

￿Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

￿Use duct tape to seal the joints between pipe sections.

￿If necessary, prepare back wall frame with cross framing lumber for secure installation.

￿Using references on Table 2 and measurements on page 16-17, decide the level of the lumber. Refer to Figure 10.

Hood Preparation before Installation

Temporarily wire the hood to test for proper operation before installing.

Important: Peel protective film off the hood and the duct cover (if any).

Attach ducting transition to hood exhaust with ten (3/16” x 3/8”) screws (included). Refer to Figure 11.

If necessary, attach two rubber stands (included) with adhesive tape (included) to the back corners of the hood.

Use eight (3/16” x 3/8”) screws (included) to attach the two hood-mounting brackets (included) to the back of the hood. Refer to Figure 12.

Figure 9

Figure 10

Figure 11

Figure 12

9

Page 11
Image 11
Kobe Range Hoods CH0330SQB, CH0348SQB, CH0336SQB, CH0342SQB Wall Mount Installation, Hood Preparation before Installation