Kobe Range Hoods CH0330SQB Duct Cover Installation, Install Accessories, Final Assembly

Models: CH0330SQB CH0348SQB

1 134
Download 134 pages 34.25 Kb
Page 63
Image 63
Manual background

Duct Cover Installation

5.Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer Figure 15. Slide the duct cover onto the hood.

6.Use 3/16” x 3/8” screws (included) to attach duct cover to hood.

Install Accessories

7.Attach oil tunnel. Refer to Figure 16.

8.Refer to Figure 17. ￿ Slide the baffle filter into the hood. ￿ Push the baffle filter upward. ￿ Slide forward. ￿ Pull downward. ￿ Fit into place.

9.For bottom casing, repeat above steps. Refer to page 17.

10.Install heating lamps (not included), 120 Volts 175 Watts max. each.

Final Assembly

11.Turn power ON in control panel. Check all lights and fan operation.

12.Make sure to leave this manual for the homeowner.

Figure 15

Figure 16

Figure 17

11

Page 63
Image 63
Kobe Range Hoods CH0330SQB, CH0348SQB, CH0336SQB, CH0342SQB Duct Cover Installation, Install Accessories, Final Assembly