Zephyr ZRM-E36AS, ZRM-E42AS manual Installation - Mounting the Hood, Ceiling Joists, Wood Blo cking

Models: ZRM-E36AS ZRM-E42AS

1 19
Download 19 pages 35.83 Kb
Page 11
Image 11
Ceiling Joists

Ceiling Joists

 

Wood Blocking

1

 

Front

2

Top Support Frame

 

3

Bottom Support Frame Wood BlockingTop Support Frame

4

 

5

Hood

6

 

!Bottom Support Frame CAUTION: At least two installers are required due to the weight and size of the hood.

 $GGDQGVHFXUHZRRGEORFNLQJ minimum 2 x 4 RQWRFHLOLQJMRLVWV

2. Fasten top support frame to desired location on ceiling using 4 2” wood screws with washers. The wider section of the support bracket faces the front of the hood.

3. Determine height requirement and secure bottom support frame to top support frame by using 8 M4*7 VFUHZV 2 on each angle bracket 

4. Lift hood and align the locking tabs on top of hood with the 3 tab cut-outs on bottom of support frame. Make sure the 4 threaded posts on top of the hood pass through the holes on bottom support frame. Slide hood forward to lock into place.

5. Secure hood to bottom support frame by fastening 4 wing-nuts over the 4 threaded corner posts on top of hood body.

6. Install damper, duct work and electrical. If using hood in recirculating mode you must install the air diverter plate before assembling the duct covers. Turn to page 11 for instructions.

1RWH+RRGLVLQWHQGHGWREHPRXQWHGWRD¿QLVKHGFHLOLQJ

!Hood WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards. This range hood must be properly grounded. Turn off electrical power at service entrance before wiring.

Installation – Mounting the Hood

9

Page 11
Image 11
Zephyr ZRM-E36AS Installation - Mounting the Hood, Ceiling Joists, Wood Blo cking, Top Support Frame, Bottom Support Frame