
Chassis Installation and Grounding
Rack Mounting Procedure
Rack Mounting Procedure
two technicians
clear access to front and rear of rack
DANGER! EXERCISE NORMAL PRECAUTIONS FOR LIFTING HEAVY OBJECTS. USE TWO PEOPLE TO LIFT THE BROADMORE 1750. WHEN
LIFTING, SUPPORT IT FROM THE BOTTOM AND TAKE CARE TO AVOID SHARP EDGES OR CORNERS.
WARNING! THE FRONT AND REAR COVERS OF THE CHASSIS MUST REMAIN ATTACHED TO PREVENT THE CHASSIS FROM BENDING DURING THE
Perform the following steps:
1.Ensure that the front and rear chassis covers are firmly attached to provide mechanical support and prevent accidental damage.
2.Carefully lift the Broadmore 1750 and position it in the desired rack location. One technician should support the rear and the second should support the front.
3.Ensure that there is a 1.75 inch space above the chassis for adequate air flow.
4.Insert screws through the chassis and rack mounting holes. Every bracket hole must have a screw securely installed to ensure proper weight distribution and support.
Broadmore 1750 - Release 4.6 |