SERVICE JOURNAL
Action | Date, mtr reading, stamp, sign |
20.Inform the customer about:
The need and advantages of following the service schedule.
The need and advantages of leaving the machine for service every 300 hours.
The effects of service and maintaining a service journal on the machine’s resale value.
Application areas for Mulch kit.
21.Fill in the sales papers, etc.
Delivery service has been carried out.
No remaining notes.
Certified:
After the First 50 Hours
1. Change engine oil and filter.
Action | Date, mtr reading, stamp, sign |
Daily
1. Check hydraulic oil level.
2. Check engine oil level.
3. Check coolant level in the overflow reservoir.
4. Check air clener dust load indicator.
5. Check/clean radiator debris guard.
59