Assembly
Before beginning assembly, carefully read the following information and instructions:
•Place all parts in a cleared area and remove the packing materials from the spa shell. Do not dis- pose of the packing materials until assembly is completed and the spa is operating.
•During assembly, make sure that all parts are oriented as shown in the drawings.
•Read each assembly step before you begin.
•Tighten all parts as you assemble them, unless instructed to do otherwise.
ASSEMBLY REQUIRES THE FOLLOWING TOOLS (not included):
•One phillips screwdriver
•You will also need a small amount of soap and a damp cloth.
A wire connector is provided on the electronics pack of the spa to connect a minimum No. 8 AWG (8.04 mm2) solid copper conductor between the spa and any metal equipment, electrical enclosure made of metal, metal water pipes, or conduit within five feet of the spa.
1.Before beginning assembly, make sure that you have read and understand the information in the box above and on the previous two pages.
Remove the Access Panel (5) by inserting your fin- gers into the indicated holes and pulling the Access Panel away from the spa. Be careful not to damage the spa shell.
Turn each of the spa jets clockwise as tightly as you can. Then, turn each jet counterclockwise until it stops.
2.Make sure that the cap (not shown) is fully tightened onto the end of the drain hose.
Locate the four gate valves inside the access open- ing (there are two gate valves per pump). Open each gate valve by pulling up on the handle until you hear a click, indicating that the gate valve is locked in the open position.
Make sure that the four collars are tightened (there are two collars per pump).
1 |
|
Spa Shell | Filter Cover |
| |
Holes |
|
5 |
|
2 |
|
Gate Valve
Collar
Drain Hose
8