ASSEMBLY |
ASSEMBLY
Plastic Shield Installation
(Nylon line operation)
Parts Required: | Plastic Debris Shield, Shield Plate, | |
| three (3) 5 x 16 mm screws. | |
|
|
|
|
|
|
|
|
|
|
|
|
The plastic shield is for use with the Nylon Line Head only. Install Metal Shield when using plastic or metal blades, or serious injury may result.
1.Remove plastic threaded shaft sleeve and adapter plate (C) from PTO shaft (A).
2.Place the shield on the bottom of the bearing housing flange.
3.Place shield plate (B) on shield, align holes. Install three (3) screws from bottom through plate and shield into gear case.
4.Assemble adapter plate (C) onto PTO shaft.
Nylon Line Head Installation
Parts Required: Nylon Line Head.
Wear Gloves or personal injury may result:
•Cutoff knife is sharp.
•Gearcase and surrounding area may be hot.
1. Be sure adapter plate (C) remains on PTO shaft (A).
A
B
C
D
A
C
2.Align locking hole in upper plate with notch in edge of gear housing and insert head locking tool (D).
3.Thread line head (E) onto shaft by turning it
D | |
(C). |
|
4. Remove locking tool (D).
E
Note: Your nylon line head may appear different than nylon line head shown.
X7532098207 | 13 |
© 2/2014 ECHO Inc.