Echo SRM-230 specifications Assembly, Plastic Shield Installation, Nylon Line Head Installation

Page 13

SRM-230

ASSEMBLY

ASSEMBLY

Plastic Shield Installation

(Nylon line operation)

Parts Required:

Plastic Debris Shield, Shield Plate,

 

three (3) 5 x 16 mm screws.

 

 

 

 

 

 

 

 

 

 

 

 

The plastic shield is for use with the Nylon Line Head only. Install Metal Shield when using plastic or metal blades, or serious injury may result.

1.Remove plastic threaded shaft sleeve and adapter plate (C) from PTO shaft (A).

2.Place the shield on the bottom of the bearing housing flange.

3.Place shield plate (B) on shield, align holes. Install three (3) screws from bottom through plate and shield into gear case.

4.Assemble adapter plate (C) onto PTO shaft.

Nylon Line Head Installation

Parts Required: Nylon Line Head.

Wear Gloves or personal injury may result:

Cutoff knife is sharp.

Gearcase and surrounding area may be hot.

1. Be sure adapter plate (C) remains on PTO shaft (A).

A

B

C

D

A

C

2.Align locking hole in upper plate with notch in edge of gear housing and insert head locking tool (D).

3.Thread line head (E) onto shaft by turning it

counter-clockwise until head is tight against adapter plate

D

(C).

 

4. Remove locking tool (D).

E

Semi-automatic nylon line heads must be used only with plastic debris shield with cut-off knife. Using nylon line heads with metal debris shield can result in trimmer damage, caused by operation with excessive line length.

Note: Your nylon line head may appear different than nylon line head shown.

X7532098207

13

© 2/2014 ECHO Inc.

Image 13
Contents Burn Hazard Operator’s ManualTable of Contents Servicing Information IntroductionAdditional or Replacement Manuals SafetyManual Safety Symbols and Important Information On / OFF International SymbolsPersonal Condition and Safety Equipment Repetitive Stress Injuries Vibration and ColdEquipment EPA 2010 and Later and/or C.A.R.B. Tier Emission Control Exhaust & EvaporativeProduct Emission Durability Emission Compliance Period Description Description Contents Plastic Shield Installation AssemblyNylon Line Head Installation To Advance Trimmer Line Support Handle InstallationRemove Nylon Line Head Operation With Blades OperationBlade Selection Fuel Requirements FuelHandling Fuel After use Starting Cold EnginePurge Bulb Starting Warm EngineStopping Engine Move stop switch button a backward to Stop positionMaintenance Intervals MaintenanceSkill Levels Fuel Filter Air FilterCooling System Spark PlugSpark Arrestor Screen Exhaust SystemExhaust Port Cleaning Carburetor AdjustmentEngine Break-In High Altitude OperationLubrication Gear HousingDrive Shaft flex cable models Nylon Line Replacement Nylon Line Head Disassembly InstructionsSharpening Metal Blades Maintenance Engine Problem Troubleshooting Chart TroubleshootingLong Term Storage Over 30 Days StorageModel SpecificationsOWNER’S Responsibility Warranty StatementsWarranty Statements SRM-230 ECHO, Incorporated