Rheem RS80-42BP Against Pitch Installations Tiled Roof, Variations for Metal and Fibreboard Roofs

Page 38

Against Pitch Installations (Tiled Roof)

Assemble the stand and then loosely bolt the baseplate to the frame in position.

For installations on a roof with a pitch greater than 20°, a ‘U’ bracket and small pipe legs should be used on top of the baseplate.

The frame installation proceeds following the instructions for side pitch installations, with the pipe legs located directly over a load-bearing wall.

Variations for Metal and Fibreboard Roofs

Assemble the stand and then loosely bolt the baseplate to the frame in position.

For installations on a roof with a pitch greater than 20°, a ‘U’ bracket and small pipe legs should be used on top of the baseplate.

The frame installation proceeds following the instructions for side pitch installations, with the pipe legs located directly over a load-bearing wall.

38

Image 38
Contents Passive Solar Water Heating Systems Care and Cleaning Safety InformationInstallation Instructions Troubleshooting TipsIntroduction Keep the use of the Backup Heater to a Minimum Try to use Hot Water during Daylight HoursWater Temperature Setting Time/Temperature Relationship in ScaldsRead and Follow this Safety Information Carefully Installing the water heater System Parts ID List Storage TankSite Inspection Equipment Pre-InstallationRecord extreme weather conditions on checklist Review Local CodesArea Requirements for Collectors System Placement RequirementsNumber Installation Plumbing/Electrical stub-outCompass Pitch Mount No. of Collectors Roof InstallationsPitch Requirements Roof Support Requirements Roof Type Installation Type Supporting StructuresRoof Survey Conventional Roof ModificationsConventional Roof Modifications Truss Frame Modifications Branch Circuit Sizing and Wire Size Guide Customer ApprovalElectrical Schematic Electrical System RequirementsTypical Installation Type of Installation= Mixing Valve = Temperature & Pressure Relief Metal / Sturdy Tile Installation Plumbing System Schematic for Installation as Pre HeaterTypes of Roof Installation Supporting Structure installation Roof PreparationInstalling the water heater Page Pipe Leg Connection Detail Frame AssemblyLower Pipe Leg Installation Collector Installation Collector Fitting Installation DetailStorage Tank Installation Metal / Sturdy-TileExternal Piping Insulation Plumbing InstallationStorage Tank Plumbing Attachment Detail, Left Side To Fill the Water Heater Electrical InstallationInstall Roof Jack Panel See Key to Stub Out Details BelowTest and Fill Procedure Test and Fill the Closed LoopInstalling the water heater Neutral Connect Storage Tank to Electrical SupplyDetail of Electrical Connections Safety Controls Operating the water heater. Installation ChecklistSafety Precautions To replace the temperature limiting controlIf adjustment is necessary… Water Temperature SettingTime/Temperature Relationship in Scalds Draining the Water Heater Care and cleaning of the water heaterRoutine Preventative Maintenance Anode RodVacation and Extended Shut-Down Vacations or Brief AbsencesBefore You Call For Service… Problem Possible Causes What To Do Low Hot Water ‘A’ Frame kit consists Installations using 17.5 a FramesFrames Side Pitch Installations Tile Roof Against Pitch Installations Tiled Roof Variations for Metal and Fibreboard RoofsVariations for Shallow Pitch or Flat Deck Roofs Flashing and Roof PenetrationsIf YOU Need Service