Raypak P-R185B To P-R405B, C-R185B To P-R405B, P-R185BL To P-R405BL, C-R185BL To C-R405BL, RP2100

Page 9

WINTERIZING THE POOL & SPA HEATER

Heaters installed outdoors in freezing climate areas are subject to be shut down for the winter. Observe the following step-by-step procedure for winterizing the heater:

1.Turn off gas valve, manual gas valve, and electrical supply to the heater.

2.Open drain plug located on the inlet/outlet header, (under water pipes). Remove the heat exchanger inspection panel on the side opposite water piping to gain access to the drain plug on the return header. Open drain plug on return header.

Return Header

Drain Plug

Disconnect compression fittings from the pressure switch and return header that connects to the 1/4" copper tube and allow the tube to drain. For ASME Heaters only.

9

Image 9
Contents What to do if YOU Smell GAS Installation and Operating InstructionsPage Contents START-UP Procedures For Your Safety Read Before OperatingBefore START-UP Burners Water Millivolt System Lighting InstructionsTo Turn OFF GAS to Appliance Electronic Ignitions Systems What to do if YOU Smell GASOperating Instructions Water Pressure Switch Maintenance and Care ProceduresAfter START-UP Visual InspectionPool & SPA Water Chemistry Automatic Chlorinators Chemical FeedersCold Weather Operation Winterizing the Pool & SPA Heater General Specifications Receiving EquipmentStandardunit Asme Unit Installation Instructions Outdoorheaters Installations onlyIndoor Heater Outdoor KIT IncludesIndoor KIT Includes Installing the Clips Indoor & Outdoor Kits Securing the TOP Panel Cover Indoor KIT onlySecuring the TOP Panel Cover Outdoor KIT only Installing the TOP Cover Outdoor KIT only Combustion AIR Indoor Units Only Specifications and DimensionsGAS Supply Connections Vent PipingGAS Pressure Adjustment Locations GAS Pressure RegulatorPipe Sizing for GAS Connections Flow Rates Plumbing for Water ConnectionsUnitherm Governor Operation Connections Asme ModelsAuxiliary Bypass Valve Adjustment External Auxiliary Bypass Valve Where RequiredHeat Exchanger Pressure Drop Tables For Asme Models call your factory representative Electrical Wiring Millivolt SystemElectronic Transformer Wiring 120V Wiring 240V WiringIndependently Wiring Diagram Millivolt Units Mechanical Thermostat Wiring Diagram IID Units atmospheric Wiring Diagram IID Units Low NOx General Location of Controlscontrols and Adjustments Control Panel RemovalMillivolt Controls Digital Thermostat Controls Thermostat Control OperationFahrenheit vs Centigrade Diagnostics Reading a FaultDisplay Definition Remote Control Installation and Operation Activating the RemoteRemote Operation Wire Remote Control On-Off Remote Control WiringFlame ROLL-OUT Safety Switch Pressure SwitchPilot Safety Millivolt Pilot Safety ElectronicBurner Drawer Removal Pilot Removal and CleaningGAS Valve Removal Main Burner and Orifice RemovalDesootingprocedure TubecleaningprocedureImmersion Well Replacement Unitherm Governor U.G. ReplacementBurneradjustment START-UP ProceduresFlame ROLL-OUT Safety Switch OperationCombustion FAN Removal Pilot RemovalMechanicalforqualifiedservicepersonnelonly Trouble Shooting GuideRaypak Pool or SPA Heater Electrical Check with MV GAS Valve Electrical Standing Pilot MillivoltFor qualified Technicians only Electrical Electronic Ignition IID TroubleshootingDigital Control Logic Flow Chart Replacement Parts List RAYPAK, INCEastman Avenue Oxnard, CA For Canada Page Pilot Assemblies Page Page Page Page Page

P-R185B To P-R405B, C-R185B To P-R405B, P-R185BL To P-R405BL, C-R185BL To C-R405BL, RP2100 specifications

Raypak offers a comprehensive line of boilers and water heaters, notably the P-R185B to P-R405B and C-R185B to P-R405B series, along with the RP2100 model. These products are engineered for efficiency, reliability, and performance in both residential and commercial applications.

The P-R185B to P-R405B series features a range of input capacities from 185,000 to 405,000 BTU/h, making them suitable for various heating requirements. The P-R series is equipped with Raypak's patented Cupro-Nickel heat exchanger, which offers superior corrosion resistance and extended life in challenging water conditions. These units also utilize a sealed combustion system, allowing for efficient operation and reduced energy consumption by drawing air from outside the building.

The C-R185B to P-R405B boilers are specifically designed for commercial applications where reliability is critical. They incorporate similar features to the standard P-R series and are built to handle higher heating demands, making them ideal for larger facilities. The C-R series models are recognized for their durable construction and advanced control systems, offering precise temperature management and enhanced performance.

In addition to these series, the P-R185BL to P-R405BL and C-R185BL to C-R405BL models feature a low-NOx design to comply with stringent environmental regulations. This means they produce lower nitrogen oxides, making them an environmentally friendly option without sacrificing performance.

The RP2100 is another standout model, known for its robust design and cutting-edge technology. It boasts a high efficiency rating and is equipped with an intuitive digital control system, allowing users to monitor and adjust settings with ease. The RP2100 also features a modulating burner system, which adjusts the flame based on the heating demand, optimizing fuel usage and minimizing operational costs.

All Raypak models are designed with safety in mind, incorporating multiple safety features like thermal shutdowns and pressure relief valves. Their compact dimensions make installation straightforward, and the low maintenance requirements ensure longevity and consistent performance.

In summary, Raypak's P-R185B to P-R405B, C-R185B to P-R405B, P-R185BL to P-R405BL, and RP2100 series represent a commitment to quality and innovation in heating solutions, providing efficient and reliable options for both residential and commercial applications.