Simplicity UV1621BV, UVG1621BV Starting and Stopping Engine, Starting and Stopping Machine Motion

Page 17

SECTION 2 – OPERATING INSTRUCTIONS

2.3 STARTING AND STOPPING ENGINE

Before attempting to start and operate machine, perform all steps in the Pre-Start Check List

2.3.1.Starting Engine

A.Sit in operator’s seat and latch seat belt. Adjust seat belt to a snug fit. If carrying a passenger, the one passenger must also be seated with seat belt securely latched and adjusted to a snug fit before starting engine.

B.Set park brake.

C.Shift transmission to neutral.

D.Make sure POWERLINK™ generator speed control lever is set all the way down to ‘SLOW’ (equipped models only).

E.Move choke control lever to the “ON” position to start a cold engine.

F.Push accelerator pedal down approximately 1/3 of travel.

G.Turn ignition key to “START” position and hold until engine starts. If after 5 to 10 seconds of cranking the engine has not started, release key and wait 20 seconds before attempting to crank the engine again.

H.After engine starts, move the choke control to the “OFF” position. Partial choke may be required to keep the engine running smoothly during the initial warm up period.

I.Allow 2 minutes for the engine to warm up. Make sure choke is in “OFF” position after engine has warmed.

J.Release accelerator pedal. Engine should idle. If engine dies, additional warm up time may be required.

2.3.2.Stopping Engine

A.Release accelerator pedal and allow engine to return to idle. Do not immediately stop a hot engine. Allow engine to idle several minutes to cool off before stopping.

B.Set park brake

C.Shift the transmission to Neutral.

D.Turn key to Stop and remove key.

2.4STARTING AND STOPPING MACHINE MOTION

IMPORTANT! – MACHINE MUST BE FULLY STOPPED AND THE ENGINE AT IDLE SPEED BEFORE SHIFTING GEARS. ALWAYS MOVE THE SHIFT LEVER WITH A QUICK AND POSITIVE MOTION TO AVOID GRINDING GEAR.

2.4.1.Starting Motion - Forward

A.Complete pre-start checklist.

B.Operator must be seated with seat belt securely latched and adjusted to a snug fit.

C.Park brake must be set and the transmission in Neutral.

15

17

D.POWERLINK™ generator speed control lever must be set all the way down to ‘SLOW’ (equipped models only).

E.Start engine and allow 2 minute warm up period.

F.Shift transmission to Forward. ENGINE MUST BE AT IDLE SPEED.

G.Release park brake.

H.Move accelerator pedal slowly and with caution. Allow machine to accelerate to desired speed.

2.4.2.Starting Motion - Reverse

WARNING

BEFORE BACKING, Stop machine completely. LOOK and SEE behind and down for children, pets and hazards, before and while backing.

A.Complete pre-start checklist.

B.Operator must be seated with seat belt securely latched and adjusted to a snug fit.

C.Park brake must be set and the transmission in Neutral.

D.POWERLINK™ generator speed control lever must be set all the way down to ‘SLOW’ (equipped models only).

E.Start engine and allow 2 minute warm up period.

F.Shift transmission to Reverse. ENGINE MUST BE AT IDLE SPEED.

G.Release park brake.

H.Back slowly. Move accelerator pedal slowly and with caution. Do not back at high speeds and avoid sudden or sharp turns while backing.

I.When changing directions from Forward to Reverse bring machine to a complete stop first. Release accelerator pedal and apply brake.

J.Shift transmission to Reverse. Release brake pedal and back slowly.

2.4.3.Stopping Motion

A.Release accelerator pedal

B.Apply a firm steady pressure to brake pedal, bringing machine to a controlled stop.

C.Set park brake.

D.Shift transmission to Neutral.

E.Stop engine.

F.Remove key.

Image 17
Contents Manual No -6153 Rev , 11/11/04 Turf Cruiser Trail CruiserProtection Against Tipovers Protection for ChildrenPreparation Carrying LoadsTowing Operation Safe Handling of GasolineMaintenance Powerlinktm by Briggs & StrattonNot featured on all models Electric Winch OperationMaintenance Table of Contents Introduction FamiliarizationControl Console Dashboard / Pedal ClusterOperator Protective Structure Control Identification & Safety SignsHeadlight Switch Specifications & Maintenance Powerlink WarningsAvoid Serious Injury or Death PRE-START Check List Operating InstructionsControls Function and Operation Check Safety Interlocks for proper functionFrom previous Warn Electric Winch not on all models Powerlink Generator System not on allSpeedometer/Fuel Gauge Combo Starting and Stopping Machine Motion Starting and Stopping EngineDriving the Machine Using Differential LockParking Machine Towing General Operating ProceduresCarrying Loads Water Crossing Transporting MachineStopping the Powerlinktm Generator Starting the Powerlinktm GeneratorTesting the Gfci Service After First 5 Hours MaintenanceService Engine Air Cleaner IntroductionCheck Transmission Fluid Level Lubrication -Axle Couplings & Steering PinsCheck Tire Pressure Check Wheel Lug NutsService Every 50 Operating Hours Service Every 25 Operating HoursStorage OUT of Season Service Every 100 Operating HoursService Every 200 Operating Hours Or Yearly Drive Belt Replacement Adjustments & RepairsService Brake & Park Brake Adjustment Battery Removal BatteryBattery Installation Cargo BED Latch Striker AdjustmentBattery Testing State of Charge Digital VoltmeterTransmission Shift ROD Adjustment Electrical 3128 Troubleshooting To be Performed Pages Maintenance ScheduleYear Limited Warranty Product Registration Form Utility Vehicles Series