Powermate PM0647001 manual Electric Start, Maintenance, Inspecting the Brushes

Page 11

ELECTRIC START

This generator model is provided with both electric start and recoil start capabilities. The charger is a low amperage (1A) maintenance type charger. It will charge your battery as your generator runs. Avoid prolonged cranking, as it can damage the engine.

The battery provided is a nominal 12 volt sealed rechargeable lead-acid battery and can be operated in any position without leakage. It complies with non-spillable battery regulations. Its convenient size offers a 30% reduction over conventional batteries.

Length = 7.14 inches, Width = 3.03 inches, Height = 6.59

inches

Weight = 12.56 lbs

 

18AH Rating

 

UL Recognized

 

Battery Kit Parts List

 

Item

Description

Qty

A

Bolt, M5 x M12

2

B.

Nut 5MM

2

C.

Washer Flat M5

2

*All parts are standard parts at your local hardware store.

Note: Brand New Generators are shipped with the Battery Connections disconnected. The Positive and Negative Terminals must be connected to the Battery before the Electric Start Feature will work.

Initial Battery Connection - Refer to the Installation Instructions Below.

Battery Removal & Installation:

Removal: Remove the two screws holding down the battery tray cover. Remove the cover by lifting up on the front and pulling backward until the tabs clear the slots exposing the battery. Remove the nut and bolt from the negative and positive post, being careful not to short across the terminals. (Shorting the terminals together can cause sparks, damage to the battery or generator or even burns or explosions.) Always abide by the safety warnings provided with the battery.

Do not short-circuit the battery terminals.

Do not charge in a sealed container.

Keep sparks, flame away.

Remove the battery from the tray and re-cycle and dispose of properly.

Installation: If the Battery Tray Cover is not already removed, remove it by taking out the two screws. Remove the cover. Hook up the new battery, or re-install the new battery, as follows. Connect the Red 10 Gauge wire to the positive (+) terminal and the Black 10 Gauge wire to the negative (-) terminal with the bolt and nut provided. Make sure all connections are tight. Terminals may need to be bent slightly after installing bolt and nut for best wire clearance under top cover. Install the battery tray cover with the two screws. Your battery is now connected and ready for use. Turn the start rocker switch to the on position and push the start switch to crank the engine. Note: Be sure Oil has been added to the engine as specified in the Owner's Manual.

MAINTENANCE

GENERATOR: Brushes

The brushes in the generator should be inspected once every year for chips and cracks. Brushes should be replaced when they are worn to 1/4 inch (7mm).

NOTE: Replace brushes in sets only, never separately.

INSPECTING THE BRUSHES:

1.Remove cover plate (R).

2.Remove 4 stator bolts (U) and endbell.

3.Remove screws holding the protective plate on the inside of the endbell.

4.Disconnect the green (-) or blue (+) brush wires from the tab.

5.Remove brush mounting screws (S).

6.Slide brushes (T) from holders.

7.Replace if worn to 1/4 inch (7mm).

8.Do not over tighten screws.

NOTE: Replace only with brushes specified in parts list. Other brushes may appear to be identical but may have completely different mechanical and electrical characteristics.

www.powermate.com

 

11

 

Customer Hotline 1-800-445-1805

 

 

 

 

 

Image 11
Contents PM0647001 Page Alto StopIndice Table of ContentsTable DES Matieres Safety and Operation Rules Spark Arresting Muffler Spark ArresterDetermining Total Wattage Operating Voltage InstallationBefore Operation CORD-SET WiringAVR Major Generator FeaturesStarting the Unit Inspecting the Brushes MaintenanceElectric Start Service and Storage Service InformationLimited Warranty Règles D’OPÉRATION ET DE Sécurité Voire la mortSilencieux PARE-ÉTINCELLES PARE-ÉTINCELLESDétermination DE LA Puissance Totale Nécessaire Vérifier LA Tension Lubrification Cable Dinstallation DE LappareilAvant DE Mettre EN Marche Mise EN Place DE LappareilCaractéristiques Principales DU Groupe Electrogene Rodage Demarrage DE LappareilEntretien Démarrage ÉlectriqueUsage ET Entreposage Service ClienteleGarantie Limitée Seguridad Reglas DE Seguridad Y DE FuncionamientoSilenciador Apagachispas ApagachispasComo Determinar EL Vataje Total EL Requerimiento DE Voltaje InstalacionAlambrado DEL Juego DE Cordones Antes DE LA OperacionInterruptor Caracteristicas Principales DEL GeneradorArranque DEL Unidad Mantenimiento Arranque EléctricoServicio AL Cliente Servicio Y AlmacenamientoGarantía Limitada Parts Drawing / Schema DES Pièces / Diagrama DE Piezas Part Description Descripción QTY Parts List / Liste DES Pièces / Lista DE Piezas0056030.01 Date Date Fecha Action Action Accion Airport Road Box Kearney, NE Fax