Section 5—Installation for Manual Transfer Switch
7a Prepare Box For Connections
Knockout
7a. Lift cover of the power inlet box and remove the internal cover plate screws and internal cover plate. Remove the knock out in the lower center of the box. From the rear of the connection box, feed wires into box. Slip the lock nut over wires tighten securely onto conduit coupling.
7b Mount Box
7b. Using appropriate fasteners, mount power inlet box over
8 Receptacle
Green
Red
White | Black |
|
Existing Wire
22
8.Connect the black, red, and white wires to the same color coded lugs on the back of the receptacle. Failure to match wires may result in damage to generator and house wiring. Strip wire insulation back 1/2” and torque lug screws to 25 in/lbs. The green wire is to be stripped back 1/2”, inserted into the ground lug and torque lug screw to 25 in/lbs. Reinstall internal cover plate and screw. Close and lock cover.
The power inlet box must be locked to ensure safety and to discourage tampering.
9 Mounting Manual Transfer Switch
1 ft
9.Locate manual transfer switch with
DANGER: Although you may choose to perform electrical connections yourself, Generac Power Systems, Inc. recommends that a licensed electrician or individual with complete knowledge of electricity perform the procedures in sections 10a and 10b.
DANGER: Switch service main circuit breaker to “OFF” or open position prior to removal of cover or removal of any wiring of the main electrical distribution panel. The wires connected to the service main circuit breaker remain live or “HOT”. Avoid contact with these wires and the service main circuit breaker connection lugs.