Meyer 62504, 62517, 62505, 62209 instruction manual Electric Throttle Control Panel Switch Functions

Page 15

Electric Throttle Control Panel Switch Functions Cont.

A. ON/OFF System power activated (ready to start). Spreader engine is not running. Spreader conveyor is not engaged.

B.START (Engine only)

1.Open fuel shut off valve on engine.

2.

On

On switch depressed.

3.

Choke

(cold engine ) Hold down for 5 seconds to move the throttle actuator to

 

 

the choke position.

 

 

Note: Choking a warm engine may not be necessary.

4.

Start

Hold down until engine starts.

4a.

 

On models with 6.5 HP at temperatures under minus 20o F (minus 29o C) it mat be

 

 

necessary to start the engine manually.

5.

Turtle

Deceases throttle speed - adjust as engine warms up. Will stop the choke function.

 

Rabbit

Increases throttle speed.

C.TO ENGAGE Spreader Conveyor

1.Push CONVEYOR switch only after you are sure no one is in the hopper or near the spinner! This lights up the red indicator light, if light does not light, take care to verify that the light is not malfunctioning.

D.TO CONTROL Conveyor Speed.

1.Hold RABBIT to increase speed. NOTE: Do not hold switch in HI position after the desired RPM is achieved or you will choke and/or stall the engine.

2.Hold TURTLE to decrease speed.

E.TO DISENGAGE Spreader Conveyor.

1.Tap START switch momentarily so that red indicator light goes out. Do not fully depress the START switch, only half way is needed. Only the conveyor stops, the engine continues to run.

F.TO TURN ENGINE OFF (with or without conveyor running).

1.Depress LO on throttle control to reduce setting to idle (this prevents engine flooding and hard starting).

2.Push OFF position on the ON/OFF switch.

NOTE: OFF can be pushed at anytime during spreader operation to cut power to the unit . However, you should normally use steps under F above.

(Once the off switch is depressed - the starting procedure must be followed for engine re-start.)

G.Do not attempt to start the engine with the conveyor engaged. (CONV switch light will be lit to indicating its' being on.)

H.Close fuel shutoff valve on engine if unit is to be transported while not running.

WARNING

1.As with all power equipment, safety is the number one concern.

2.Do not operate this equipment until you fully understand how it functions.

3.Before starting engine, be sure that no one is near the rear of the unit and that no one is inside the unit!

4.Do not start the engine or engage the conveyor (which is interconnected to the spinner); until everyone is clear from moving parts and flying material from the spinner.

15

Image 15
Contents Index 2.0 CU. YD. Insert Hopper SpreaderTurn OFF ALL Power Before Performing ANY Service Operations Safe Equipment Installers and OperatorsInstallation Instructions Installation and Assembly InstructionsInstallation Instructions Optional HOLD-DOWN KITPart Number QTY Description Electric Throttle Go to Assembly InstructionsDiagram a Table for Diagram a Factory Installed Actuators Installation Instruction for Electric Throttle ControlsSerious Injury or Death Might Occur Center High Mount Stop Lamp Chsml PV Spreader Chmsl InstallationCenter High Mounting Stop Light Hydraulics Control and Hydraulic System SpecificationsSingle Flow Control Valve Dual Flow VALVE/STAND Installation InstructionsThrottle Electric Throttle Control Panel Switch Functions Spreader Operation Desired Spread Pattern Baffle SettingService Bulletin no Maintenance Parts List Part Number QTY Description Parts List for Hydraulic MotorHydraulic Driven Hopper Spreader Parts List for Hydraulic Driven Hopper Assemblies Hydraulic Driven Hopper Spreader Carbon Steel Cu. Yd.62520 2.0 Cu. Yd Hydraulic Driven Hopper Spreader Stainless Steel After 11-1998 S/N Cu. Yd.62522 2.0 Cu. Yd Hydraulic Driven Hopper Spreader Stainless Steel Cu. Yd.62522 2.0 Cu. Yd Engine Driven Hopper Spreader Parts List for Engine Driven Hopper Assemblies Engine Driven Hopper Spreader Chain Roller No Old Style Hopper use Parts List for Engine Driven43, 44 Stainless Steel After 11-1998 S/N Cu. Yd.62516 2.0 Cu. Yd 43, 44 Stainless Steel Cu. Yd.62516 2.0 Cu. Yd 1822 QTY Description Parts List for Durst Gear BOX AssemblySuperior Gearbox Assembly After 11/4/02 Parts List for Superior Gearbox AssemblyShort Spinner Assembly PART. no QTY Description Parts List for Spinner Assembly Short Parts onlyParts List for Hydraulic Motor Driven Units Original Version of StandardIntermediate Standard Spinner Assembly Extended Hydraulic Steel Spinner Assy Extended Spinner Assembly Parts List for Extended Spinner Assembly Extended Parts only Electric Controls Parts & Schematic Honda Actuator PIN Connector Cable & PlugParts List Honda Actuator Electric Controls Parts & SchematicBriggs Actuator Briggs Actuator MTG. Tabs Control BOXParts List PART. no QTY Description Parts List for Control Panel AssemblyPage Auxilary Components Parts List for Shipping CartonName Plate Information Spreader ONE Year Warranty Meyer Products Euclid Avenue Cleveland, Ohio