SINGLE FLOW CONTROL VALVE
| 61190 |
|
|
| |
| * | FLANGE PLATE |
| ||
| BOTTOM VIEW |
|
| A - A |
|
| (SHOWN W / O FITTINGS) |
|
A | A | 8.0" |
HOSE SLACK | ||
AFTER PLUMMING | ||
|
| VALVE STAND |
|
| (2) HALVES |
|
| |
|
| TRUCK CAB |
|
| FLOOR BOARD |
|
| 13 |
DUAL FLOW VALVE/STAND
INSTALLATION INSTRUCTIONS
1.IMPORTANT: A pipe joint sealant compatible with hydraulic oil must be applied to all screw fittings. (Teflon Tape Sealant Is Not Recommended)
2.Hose ends connected to flow valve must be of the "swivel" type.
3.CAUTION: Over tightening of the fittings in flow valve may cause damage to valve body.
4.Approximately 8" of hose slack must be realized between the flow valve and valve stand after the flow valve has been completely plumbed. If this condition does not exist after the plumbing has been completed, removal of valve will require hoses to be removed at opposite end of valve.
5.Assembly of valve on stand:
a.Cut a 5" x 5" square opening in floor board of truck where the valve stand is to be located.
b.Bolt valve stand halves together forming a "box" over the 5" x 5" square opening. NOTE: When bolting valve stand halves in place, make sure holes in flanges align with holes in flange plate.”*”
c.Bolt flange plate to VALVE (Use (2) 1/4" x 3" bolts, lockwashers, etc.)
d.Insert hoses through floor opening and valve stand and connect appropriate hoses (see instructions #1 thru #4) to flow valve.
e.Bolt flange plate to valve stand flanges.