4.. Management with Web browser software
4..4 Event Scheduling
The scheduling function enables to setup scheduled events including power on / power off. It enables to be
NOTE • You can schedule the following control events: Power ON/OFF, Input Source and Transferred Image Display.
•The power on / off event has the lowest priority among the all events that are defined at the same time.
•There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (75)
•The priority for scheduled events is as follows 1) specific date 2) weekly 3) daily.
•Up to five specific dates are available for scheduled events. Priority is given to those with the lower numbers when more than one event has been scheduled for the same date and time (e.g., ‘Specific day No. 1’ has priority over ‘Specific day No. 2’ and so on.
•Be sure to set the date and time before enabling scheduled events. (77)
92