NEC 5800/320Fd manual Moving the Cabinet to the Installation Site

Page 10

If the corridor and door dimensions are large enough to accommodate the unpacked cabinet still tied to its pallet, use a pallet jack to move it from the delivery site to the installation site, as described in “Moving the Cabinet to the Installation Site” on page 6.

If the corridor and door dimensions are too small to accommodate the unpacked cabinet still tied to its pallet, unpack the cabinet and unload it from the pallet before you move it to the installation site. In this case, use the pallet jack to move the unpacked cabinet as close to the installation site as possible. Then, unpack the cabinet, remove it from its pallet, and roll it carefully on its casters to the installation site.

Moving the Cabinet to the Installation Site

!W A R N I N G

To avoid personal injury or damage to the systems or cabinet, two persons are required to move, unpack, and install a cabinet that contains Express5800/320Fd systems. Because of the size and weight of the systems in cabinets, consider using professional movers to deliver and move the packaged units to the installation site.

!C A U T I O N

To prevent or minimize condensation on the systems’ internal and external surfaces, avoid exposing the systems to extreme temperature or humidity changes when moving them to the installation site. If the systems have been exposed to extreme temperature or humidity conditions during transit, or if condensation is

-6-

Image 10
Contents Read Me First Unpacking Express5800/320Fd System Cabinets NEC Corporation of AmericaPage Contents Page Introduction Packaged CabinetCabinet Packaged for Shipping Tie-down Ramp Shows the dimensions of a packaged 38U cabinet Before Unpacking the CabinetDimensions of a Packaged 38U Cabinet Dimensions of a Packaged 24U Cabinet 56.5 Moving the Cabinet to the Installation Site Unpacking and Checking the Cabinet To unpack the cabinetTools Needed to Unpack the Cabinet Removing the Packing MaterialsCutting the Exterior Shipping Straps Remove the plastic wrap encasing the cabinet Removing the Interior Shipping Straps Wooden-Restraint Blocks Inserting the Lever Bar Tilting the Cabinet Removing the Cabinet from the Pallet Sliding Back the Wooden Restraint BlocksPosition the Pallet Ramp Checking the Cabinet and Systems Moving the Cabinet Down the Pallet RampVerifying the Express5800/320Fd Serial Number Stabilizing the Systems Stabilization GuidelinesWhat Happens Next? Disposing of Shipping MaterialsSystem Documentation Getting Help Online support from NEC Technical Support. You