NEC 5800/320Fd manual

Page 4

-iv-

Image 4
Contents Read Me First Unpacking Express5800/320Fd System Cabinets NEC Corporation of AmericaPage Contents Page Introduction Packaged CabinetCabinet Packaged for Shipping Tie-down Ramp Shows the dimensions of a packaged 38U cabinet Before Unpacking the CabinetDimensions of a Packaged 38U Cabinet Dimensions of a Packaged 24U Cabinet 56.5 Moving the Cabinet to the Installation Site Unpacking and Checking the Cabinet To unpack the cabinetTools Needed to Unpack the Cabinet Removing the Packing MaterialsCutting the Exterior Shipping Straps Remove the plastic wrap encasing the cabinet Removing the Interior Shipping Straps Wooden-Restraint Blocks Inserting the Lever Bar Tilting the Cabinet Removing the Cabinet from the Pallet Sliding Back the Wooden Restraint BlocksPosition the Pallet Ramp Checking the Cabinet and Systems Moving the Cabinet Down the Pallet RampVerifying the Express5800/320Fd Serial Number Stabilizing the Systems Stabilization GuidelinesWhat Happens Next? Disposing of Shipping MaterialsSystem Documentation Getting Help Online support from NEC Technical Support. You