NEC 5800/320Fd manual Introduction, Packaged Cabinet

Page 5

Introduction

Read Me First: Unpacking Express5800/320Fd Cabinets describes how to move cabinets that contain these systems to an installation site and how to unpack them.

Warnings, cautions, and notes in this document convey the following special information:

!W A R N I N G

A warning indicates a situation where failure to take or avoid a specified action could cause bodily harm or loss of life.

!C A U T I O N

A caution indicates a situation where failure to take or avoid a specified action could damage a hardware device, program, system, or data.

N O T E

A note provides important information concerning the operation of your system.

Packaged Cabinet

Figure 1 shows a shipping container for a 38U cabinet that contains one or more systems and optional components. (“U,” for unit, equals 1.75 inches (in.), or 4.45 centimeters (cm).)

-1-

Image 5
Contents NEC Corporation of America Read Me First Unpacking Express5800/320Fd System CabinetsPage Contents Page Packaged Cabinet IntroductionCabinet Packaged for Shipping Tie-down Ramp Before Unpacking the Cabinet Shows the dimensions of a packaged 38U cabinetDimensions of a Packaged 38U Cabinet Dimensions of a Packaged 24U Cabinet 56.5 Moving the Cabinet to the Installation Site To unpack the cabinet Unpacking and Checking the CabinetRemoving the Packing Materials Tools Needed to Unpack the CabinetCutting the Exterior Shipping Straps Remove the plastic wrap encasing the cabinet Removing the Interior Shipping Straps Wooden-Restraint Blocks Inserting the Lever Bar Tilting the Cabinet Sliding Back the Wooden Restraint Blocks Removing the Cabinet from the PalletPosition the Pallet Ramp Moving the Cabinet Down the Pallet Ramp Checking the Cabinet and SystemsVerifying the Express5800/320Fd Serial Number Stabilization Guidelines Stabilizing the SystemsSystem Documentation Disposing of Shipping MaterialsWhat Happens Next? Online support from NEC Technical Support. You Getting Help