Emerson 7000 SERIES ATB manual Index, See Controller User’s Guide

Page 14

A

auxiliary circuits, 1–2

B

bus connections, 1–2 bypassing the ATS, 3–1

C

catalog number, cover cleaning, 2–1

connections power, 1–2

controller disconnecting, 2–1

see Controller User’s Guide

E

electrical operation, 1–7

Emergency Source Accepted light, 1–5

engine starting contacts, 1–2

F

frequency, generator, 2–2 functional test, 1–5, 1–6, 1–7

H

harness, 1–2 disconnect plugs, 2–1

INDEX

I

inspection, 1–4, 3–1 installation, 1–1, 1–3 isolating the ATS, 3–1

L

lights, 1–5, 1–6

load connected to emergency, 1–5 load connected to normal, 1–5 lubrication, 2–1

M

maintenance, preventive, 2–1

maintenance handle, 2–2 warning, 2–2

manual load transfer, 2–2 warning, 2–2

N

nameplate, cover

Normal Source Accepted light, 1–5

O

operation electrical, 1–7 manual, 1–6

warning, 1–6

P

parts, 2–1

phase rotation check, 1–2 preventive maintenance, 2–1 problem, 2–2

R

rating label, cover replacement parts, 2–1 return to service, 3–3

S

service

ASCO Services, Inc. (ASI), 2–1 settings

see Controller User’s Guide

T

test, functional, 1–5, 1–6, 1–7 testing power cables, 1–1 time delays, 2–1

see Controller User’s Guide

Transfer Control selector switch Retransfer Delay Bypass, 1–7 Transfer Test, 1–7

Transfer Switch Connected To Emergency light, 1–7

Transfer Switch Connected To Normal light, 1–7

transfer test, 1–7, 2–1

transfer to emergency, 1–7, 2–1 transfer to normal, 1–7, 2–1 troubleshooting, 2–2

V

voltage checks, 1–5

voltage, pickup and dropout settings see Controller User’s Guide

Printed in U.S.A.

Image 14
Contents Nameplate Table of ContentsRating Label Catalog Number IdentificationTesting Power Conductors InstallationRemove the Transfer Switch Supporting FoundationBus Connections InstallationConnecting Power Conductors HarnessesInstall the Transfer Switch Do not apply any electrical power to the ATB yetInstallation Inspection Move ATS from Disconnected To Test PositionVoltage Checks Automatic Transfer Bypass-Isolation SwitchFunctional Test Rotating Weight Handle Manual Operation TestAutomatic Transfer Turn and hold Transfer Control switch clockwise to TransferElectrical Operation Replacement Parts Testing & ServicePreventive Maintenance Disconnecting the ControllerManual Load Transfer Testing & ServiceTROUBLE-SHOOTING Isolating Bypassing & IsolatingBypassing Bypassing & Isolating Transfer Switch RemovalTransfer Switch Reinstallation Transfer Test Return to ServiceTo change the position of transfer switch Index See Controller User’s Guide