7.2.11.Setting the PAD PCB
1.Fix the PAD PCB using the 2 Screws. <N29>
2.Attach the TP PCB Screw Sheet.
3.Connect the Cable to the Connector. (CN802)
4.Connect the Cable to the Connector (CN801) and attach the Tape.
TP PCB Screw Sheet
Tape <N29>
Screws <N29>: DRQT26+E3FNL
<N29>
Connector (CN801)
Pad PCB
Connector (CN802)
■Assembly of PAD PCB
*Notes:
1.Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2
Order of fixing
Screw Screw
Insert the boss at an angle to put here close to the Cabinet side.
CAUTION | S1:Insulation S2:Pinching Cables S3:Sharp Edge |
S4:Part No. Check S5:Others | |
|
|
Cable Hold Sheet is installed
Process the SP cable between the bosses.
FFC Insertion
PCB Pad is set
Safety Working
Attach the Touch Pad | S1 |
PCB Screw Sheet |
Safety Working
Attach the Touch Pad INS Sheet
Avoid running over the boss and the rib.
0 | 2 |
| Safety Working |
| S2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Do not insert the Connector at an angle. | ||||||||||||||||||
S1 |
|
|
|
|
|
|
|
|
|
|
|
| 0 | 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| FFC Insertion |
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Attach the Touch |
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
| Tighten of |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Pad FFC Fix Tape |
|
|
|
|
| ||||||||||
|
| Attach the Tape |
|
|
|
|
|
|
|
| Screw |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 0 2 |
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||
|
| Fit to the Cabinet line. |
|
|
|
|
|
|
|
|
|
|
| Tighten of |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
| 7 | 11 |
|
|
|
| Screw |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||
|
| Safety Working | S2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
| S2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
| Safety Working |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 0 | 2 |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Attach the |
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Cable Sheet |
|
|
|
|
|
|
|
|
|
|
| |||
|
|
| Attach the Tape |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
| Fit to the Cabinet line. |
|
|
|
|
| 7 11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Process the surplus of FFC to the back.
PCB Pad
LED PCB
Process the wire targeting the boss.
CN Connection After connecting, add the kapton tape.