RECEIVE MODULE FOR SERVSWITCH™ MULTI HUB
RECEIVE MODULE FOR SERVSWITCH™ MULTI HUB
NOTE
If it will be easier for you to configure the Receive Module while you’re looking at cables you’ve already installed, feel free to attach your expansion cables to the Module (refer to step 4) before you do step 3.
3. Next you will need to configure the DIP switches on your Receive Module. The Module has sixteen |
Receive ports on it, numbered 1 through 16 from left to right, as shown in Figure 3 on the next page. Each |
Up to 125 ft. (38.1 m)
ON |
| ON |
| ON | ||||||
|
|
|
|
|
|
|
|
|
|
|
1 | 2 | 1 | 2 | 1 | 2 |
From over 125 ft. (38.1 m)
to 225 ft. (68.6 m)
ON |
| ON |
| ON | ||||||
|
|
|
|
|
|
|
|
|
|
|
1 | 2 | 1 | 2 | 1 | 2 |
From over 225 ft. (68.6 m)
to 250 ft. (76.2 m)
ON |
| ON |
| ON | ||||||
|
|
|
|
|
|
|
|
|
|
|
1 | 2 | 1 | 2 | 1 | 2 |
port has three |
attached to the port. The locations of these DIP switches are shown in Figure 1, and their possible settings are |
shown in Figure 2 on the next page. For any given Receive port, leave all of the switch positions set to OFF if |
the cable you’ll be attaching to that port isn’t more than 125 ft. (38.1 m) long. If the cable is longer than |
125 ft. (38.1 m) but not more than 225 ft. (68.6 m), move the |
cable is longer than 225 ft. (68.6 m), up to the Switch’s maximum supported CAT5 |
250 ft. (76.2 m), move all of the switch positions to ON. |
PORT 1 | PORT 2 |
DIP Switch Area | DIP Switch Area |
PORT 3 | PORT 4 |
DIP Switch Area | DIP Switch Area |
PORT 5 | PORT 6 |
DIP Switch Area | DIP Switch Area |
PORT 7 | PORT 8 |
DIP Switch Area | DIP Switch Area |
PORT 9 | PORT 10 |
DIP Switch Area | DIP Switch Area |
PORT 11 | PORT 12 |
DIP Switch Area | DIP Switch Area |
PORT 13 | PORT 14 |
DIP Switch Area | DIP Switch Area |
PORT 15 | PORT 16 |
DIP Switch Area | DIP Switch Area |
Figure 1. The DIP-switch areas on the Receive Module’s circuit board.
Figure 2. The Receive Module’s possible DIP-switch settings.
Video
Keyboard/
Mouse
Figure 3. The port layout of the Receive Module.
4.Remove the blanking plate on the Hub’s rear panel that covers the slot you want to install your Receive Module in. Gently slide your Module into the Hub’s chassis and tighten the retaining screws.
5.Lastly, referring to the layout you should have planned in step 1, run Category 5 cables between the ports on the Receive Module and the ports on the CAT5 Transmit Cards in the other ServSwitch Multi units in your system. For each
The Receive Module should now be ready for continuous operation, as soon as you update the configuration of the rest of your ServSwitch Multi system. Refer to your ServSwitch Multi system’s manual for information about operating the ServSwitch Multi Hub and the rest of your ServSwitch Multi system.