IBM Z10 BC manual Amendment for CBU Tests

Page 42

can be added up to what the physical hardware model can contain for up to 10 days for a test activation or 90 days for a true disaster recovery.

On system z10 the CBU entitlement records contain an expiration date that is established at the time of order and is dependent upon the quantity of CBU years. You will now have the capability to extend your CBU entitle- ments through the purchase of additional CBU years. The number of CBU years per instance of CBU entitlement remains limited to fi ve and fractional years are rounded up to the near whole integer when calculating this limit. For instance, if there are two years and eight months to the expiration date at the time of order, the expiration date can be extended by no more than two additional years. One test activation is provided for each additional CBU year added to the CBU entitlement record.

CBU Tests: The allocation of the default number of test activations changed. Rather than a fi xed default number of fi ve test activations for each CBU entitlement record, the number of test activations per instance of the CBU entitlement record will coincide with the number of CBU years, the number of years assigned to the CBU record. This equates to one test activation per year for each CBU entitlement purchased.Additional test activations are now available in quantities of one and the number of test acti- vations remains limited at 15 per CBU entitlement record.

These changes apply only to System z10 and to CBU entitlements purchased through the IBM sales channel or directly from Resource Link.

There are terms governing System z Capacity Back Up (CBU) now available which allow customers to execute production workload on a CBU Upgrade during a CBU Test.

While all new CBU contract documents contain the new CBU Test terms, existing CBU customers will need to exe- cute a contract to expand their authorization for CBU Test upgrades if they want to have the right to execute produc- tion workload on the CBU Upgrade during a CBU Test.

Amendment for CBU Tests

The modifi cation of CBU Test terms is available for existing CBU customers via the IBM Customer Agreement Amend- ment for IBM System z Capacity Backup Upgrade Tests (in the US this is form number Z125-8145). This amendment can be executed at any time, and separate from any par- ticular order.

Capacity for Planned Event (CPE): Temporary access to dormant PUs, intended to replace capacity lost within the enterprise due to a planned event such as a facility upgrade or system relocation. This offering is available only on the System z10. CPE is similar to CBU in that it is intended to replace lost capacity; however, it differs in its scope and intent. Where CBU addresses disaster recovery scenarios that can take up to three months to remedy, CPE is intended for short-duration events lasting up to three days, maximum. Each CPE record, once activated, gives you access to all dormant PUs on the machine that can be confi gured in any combination of CP capacity or specialty engine types (zIIP, zAAP, SAP, IFL, ICF).

On/Off Capacity on Demand (On/Off CoD): Temporary access to dormant PUs, intended to augment the existing capacity of a given system. On/Off CoD helps you contain workload spikes that may exceed permanent capacity such that Service Level Agreements cannot be met and business conditions do not justify a permanent upgrade. An On/Off CoD record allows you to temporarily add CP capacity or any and all specialty engine types (zIIP, zAAP, SAP, IFL, ICF) up to the following limits:

42

Image 42
Contents IBM System z10 Business Class z10 BC Reference Guide Table of Contents IBM System z10 Business Class z10 BC Overview Think Big, Virtually LimitlessMore Solutions, More Affordable Special workloads, Specialty engines, affordable technologyNew Face Of System z Architecture Z10 BC ArchitectureArchitecture operating system support Page Commitment to system integrity VSE TPFLinux on System z Operating System ESA/390Z10 BC Page Page Z10 BC Design and Technology Z10 BC Model Z10 BC capacity identifiersMemory Dimm sizes 2 GB and 4 GB Z10 BC model upgrades Z10 BC Model Capacity IDsZ10 BC Performance Large System Performance ReferenceCPU Measurement Facility Z10 BC I/O Subsystem System I/O Configuration AnalyzerZ10 BC Channels and I/O Connectivity Concurrent Update Support of Spanned Channels and Logical PartitionsModes of Operation Ficon Support for Cascaded Directors FCP ChannelsFCP Full fabric connectivity FCP increased performance for small block sizesScsi IPL now a base function High Performance Ficon improvement in performancePreplanning and setup of SAN for a System z10 environment Platform and name server registration in Ficon channelNPort ID Virtualization DistanceFicon Express enhancements for Storage Area Networks Program Directed re-IPLFicon Link Incident Reporting Serviceability EnhancementsFeature Infrastructure Ports per OSA-Express3 the newest family of LAN adaptersOSA-Express3 Ethernet features Summary of benefits OSA-Express2 availabilityType FeaturesPurpose/Traffic OSA-Express3 10 Gigabit Ethernet LROSA-Express3 1000BASE-T Ethernet OSA-Express3-2P Gigabit Ethernet SXFour-port exploitation on OSA-Express3 GbE SX and LX OSA-Express3-2P 1000BASE-T EthernetNetwork Traffic Analyzer Link aggregation for z/VM in Layer 2 mode Dynamic LAN idle for z/OSLayer 2 transport mode When would it be used? OSA Layer 3 Virtual MAC for z/OSIBM Communication Controller for Linux CCL Direct Memory Access DMAHardware data router OSA-Express3 and OSA-Express2 OSN OSA for NCPOSA Integrated Console Controller Remove L2/L3 LPAR-to-LPAR RestrictionOSA/SF Virtual MAC and Vlan id Display Capability HiperSockets HiperSockets Enhancement for zIIP Exploitation Security Cryptography Can Do IT securelyCP Assist for Cryptographic Function Cpacf Enhancements to CP Assist for Cryptographic Func Tion Cpacf Configurable Crypto Express2Crypto Express2-1P Dynamically add crypto to a logical partition Support for ISOSupport for RSA keys up to 4096 bits Secure Key AESEnhancement with TKE 5.3 LIC Support for 13- thru 19-digit Personal Account NumbersTKE 5.3 workstation Smart Card ReaderRemote Loading of Initial ATM Keys TKE additional smart cards new featureSystem z10 BC cryptographic migration Remote Key Loading BenefitsOn Demand Capabilities Capacity on Demand Temporary CapacityAmendment for CBU Tests Capacity Provisioning OS Capacity provisioning allows you to set up rules System z9 System z10Reliability, Availability, and Serviceability RAS RAS Design FocusHardware System Area HSA Enhanced Driver MaintenanceAvailability Functions Redundant I/O InterconnectService Enhancements Dynamic Oscillator SwitchoverConcurrent Memory Upgrade Transparent SparingEnvironmental Enhancements Power MonitoringPower Estimation Tool IBM Systems Director Active Energy ManagerImproved service time with Coupling Facility Duplex Parallel Sysplex Cluster TechnologyCoupling Facility Control Code Cfcc Level Coupling Facility Configuration Alternatives System-Managed CF Structure DuplexingParallel Sysplex Coupling Connectivity Introducing long reach InfiniBand coupling linksCoupling Connectivity for Parallel Sysplex Server Time Protocol STP Z10 Coupling Link OptionsTime synchronization and time accuracy on z10 BC Server Time Protocol enhancementsPreview Improved STP System Management with Enhanced STP recovery when Internal Battery Feature Continuous Availability of NTP servers used as ExterInternal Battery Feature Recommendation Application Programming Interface API to automateInternet Protocol, Version 6 IPv6 HMC System SupportFamily Machine Type HMC/SE Console MessengerEnhanced installation support for z/VM using the HMC HMC z/VM Tower System Management EnhancementsImplementation Services for Parallel Sysplex Fiber Quick Connect for Ficon LX Environments GdpsZ10 BC Highlights and Physical Dimensions Z9 BC Z10 BC Physical CharacteristicsZ10 BC System Power Physical PlanningZ10 BC Configuration Detail Z10 BC Concurrent PU ConversionsIBF Z10 BC Model StructureZ10 BC Minimum Maximum Z10 BC IBF hold uptime Drawer DrawersCoupling Facility CF Level of Support Z890Statement of Direction Available in the Library section of Resource Link PublicationsFollowing Redbook publications are available now Resource LinkZSO03021-USEN-02