IBM Z10 BC manual OS Capacity provisioning allows you to set up rules, System z9 System z10

Page 44

z/OS Capacity provisioning allows you to set up rules

defi ning the circumstances under which additional capac- ity should be provisioned in order to fulfi ll a specifi c busi- ness need. The rules are based on criteria, such as: a specifi c application, the maximum additional capacity that should be activated, time and workload conditions. This support provides a fast response to capacity changes and ensures suffi cient processing power will be available with the least possible delay even if workloads fl uctuate.

An installed On/Off CoD record is a necessary prerequisite for automated control of temporary capacity through z/OS Capacity Provisioning.

See z/OS MVS Capacity Provisioning User’s Guide (SA33- 8299) for more information.

On/Off CoD Test: On/Off CoD allows for a no-charge test. No IBM charges are assessed for the test, including IBM charges associated with temporary hardware capacity, IBM software, or IBM maintenance. This test can be used to validate the processes to download, stage, install, acti- vate, and deactivate On/Off CoD capacity non-disruptively. Each On/Off CoD-enabled server is entitled to only one no- charge test. This test may last up to a maximum duration of 24 hours commencing upon the activation of any capac- ity resources contained in the On/Off CoD record. Activa- tion levels of capacity may change during the 24 hour test period. The On/Off CoD test automatically terminates at the end of the 24 hours period. In addition to validating the On/Off CoD function within your environment, you may choose to use this test as a training session for your per- sonnel who are authorized to activate On/Off CoD.

SNMP API (Simple Network Management Protocol Appli- cation Programming Interface) enhancements have also been made for the new Capacity On Demand features.

More information can be found in the System z10 Capacity On Demand User’s Guide, SC28-6871.

Capacity on Demand – Permanent Capacity

Customer Initiated Upgrade (CIU) facility: When your business needs additional capacity quickly, Customer Initiated Upgrade (CIU) is designed to deliver it. CIU is designed to allow you to respond to sudden increased capacity requirements by requesting a System z10 BC PU and/or memory upgrade via the Web, using IBM Resource Link, and downloading and applying it to your System z10 BC server using your system’s Remote Support connec- tion. Further, with the Express option on CIU, an upgrade may be made available for installation as fast as within a few hours after order submission.

Permanent upgrades: Orders (MESs) of all PU types and memory for System z10 BC servers that can be delivered by Licensed Internal Code, Control Code (LIC-CC) are eligible for CIU delivery. CIU upgrades may be performed up to the maximum available processor and memory resources on the installed server, as confi gured. While capacity upgrades to the server itself are concurrent, your software may not be able to take advantage of the increased capacity without performing an Initial Programming Load (IPL).

 

System z9

 

System z10

 

 

 

 

 

 

Resources

CP, zIIP, zAAP, IFL, ICF

 

CP, zIIP, zAAP, IFL, ICF, SAP

Offerings

Requires access to IBM/

 

No password required or

 

RETAIN® to activate

 

access to IBM/RETAIN to

 

 

 

activate

 

CBU, On/Off CoD

 

CBU, On/Off CoD, CPE

 

One offering at a time

 

Multiple offerings active

Permanent

Requires de-provisioning

 

Concurrent with temporary

upgrades

of temporary capacity first

 

offerings

Replenishment

No

 

Yes w/ CBU & On/Off CoD

CBU Tests

5 tests per record

 

Up to 15 per record

CBU Expiration

No expiration

 

Specific term length

Capacity

 

 

 

Provisioning

No

 

Yes

Manager Support

 

 

 

44

Image 44
Contents IBM System z10 Business Class z10 BC Reference Guide Table of Contents IBM System z10 Business Class z10 BC Overview Think Big, Virtually LimitlessMore Solutions, More Affordable Special workloads, Specialty engines, affordable technologyNew Face Of System z Architecture operating system support ArchitectureZ10 BC Architecture Page Commitment to system integrity VSE TPFLinux on System z Operating System ESA/390Z10 BC Page Page Z10 BC Design and Technology Memory Dimm sizes 2 GB and 4 GB Z10 BC ModelZ10 BC capacity identifiers Z10 BC model upgrades Z10 BC Model Capacity IDsCPU Measurement Facility Z10 BC PerformanceLarge System Performance Reference Z10 BC I/O Subsystem System I/O Configuration AnalyzerZ10 BC Channels and I/O Connectivity Modes of Operation Concurrent UpdateSupport of Spanned Channels and Logical Partitions Ficon Support for Cascaded Directors FCP ChannelsFCP increased performance for small block sizes Scsi IPL now a base functionFCP Full fabric connectivity High Performance Ficon improvement in performancePreplanning and setup of SAN for a System z10 environment Platform and name server registration in Ficon channelDistance Ficon Express enhancements for Storage Area NetworksNPort ID Virtualization Program Directed re-IPLServiceability Enhancements Feature Infrastructure Ports perFicon Link Incident Reporting OSA-Express3 the newest family of LAN adaptersOSA-Express3 Ethernet features Summary of benefits OSA-Express2 availabilityFeatures Purpose/TrafficType OSA-Express3 10 Gigabit Ethernet LROSA-Express3-2P Gigabit Ethernet SX Four-port exploitation on OSA-Express3 GbE SX and LXOSA-Express3 1000BASE-T Ethernet OSA-Express3-2P 1000BASE-T EthernetNetwork Traffic Analyzer Link aggregation for z/VM in Layer 2 mode Dynamic LAN idle for z/OSLayer 2 transport mode When would it be used? OSA Layer 3 Virtual MAC for z/OSDirect Memory Access DMA Hardware data routerIBM Communication Controller for Linux CCL OSA-Express3 and OSA-Express2 OSN OSA for NCPOSA/SF Virtual MAC and Vlan id Display Capability OSA Integrated Console ControllerRemove L2/L3 LPAR-to-LPAR Restriction HiperSockets HiperSockets Enhancement for zIIP Exploitation CP Assist for Cryptographic Function Cpacf Security CryptographyCan Do IT securely Crypto Express2-1P Enhancements to CP Assist for Cryptographic Func Tion CpacfConfigurable Crypto Express2 Support for ISO Support for RSA keys up to 4096 bitsDynamically add crypto to a logical partition Secure Key AESSupport for 13- thru 19-digit Personal Account Numbers TKE 5.3 workstationEnhancement with TKE 5.3 LIC Smart Card ReaderTKE additional smart cards new feature System z10 BC cryptographic migrationRemote Loading of Initial ATM Keys Remote Key Loading BenefitsOn Demand Capabilities Capacity on Demand Temporary CapacityAmendment for CBU Tests Capacity Provisioning OS Capacity provisioning allows you to set up rules System z9 System z10Reliability, Availability, and Serviceability RAS RAS Design FocusEnhanced Driver Maintenance Availability FunctionsHardware System Area HSA Redundant I/O InterconnectDynamic Oscillator Switchover Concurrent Memory UpgradeService Enhancements Transparent SparingPower Monitoring Power Estimation ToolEnvironmental Enhancements IBM Systems Director Active Energy ManagerCoupling Facility Control Code Cfcc Level Improved service time with Coupling Facility DuplexParallel Sysplex Cluster Technology Coupling Facility Configuration Alternatives System-Managed CF Structure DuplexingParallel Sysplex Coupling Connectivity Introducing long reach InfiniBand coupling linksCoupling Connectivity for Parallel Sysplex Z10 Coupling Link Options Time synchronization and time accuracy on z10 BCServer Time Protocol STP Server Time Protocol enhancementsPreview Improved STP System Management with Enhanced STP recovery when Internal Battery Feature Continuous Availability of NTP servers used as ExterInternal Battery Feature Recommendation Application Programming Interface API to automateHMC System Support Family Machine TypeInternet Protocol, Version 6 IPv6 HMC/SE Console MessengerEnhanced installation support for z/VM using the HMC HMC z/VM Tower System Management EnhancementsImplementation Services for Parallel Sysplex Fiber Quick Connect for Ficon LX Environments GdpsZ10 BC Physical Characteristics Z10 BC System PowerZ10 BC Highlights and Physical Dimensions Z9 BC Physical PlanningZ10 BC Configuration Detail Z10 BC Concurrent PU ConversionsZ10 BC Model Structure Z10 BC Minimum MaximumIBF Z10 BC IBF hold uptime Drawer DrawersCoupling Facility CF Level of Support Z890Statement of Direction Publications Following Redbook publications are available nowAvailable in the Library section of Resource Link Resource LinkZSO03021-USEN-02