Xerox Nuvera™ 100/120 Digital Copier/Printer Customer Expectations Document
Product Space & Power Requirements
Item | Xerox Nuvera™ 100/120 Digital | Comments |
| Copier/Printer |
|
Size – Printer | 131.3” (W) x 30” (D) x 61.6” (H) |
|
w/ 1 SFM & | 3336mm x 736mm x 1565.6mm |
|
Professional |
|
|
MFF |
|
|
Width – | 31.7” ( 805mm) | Optional |
additional |
|
|
SFM |
|
|
Service Space | Fixed: 162” (W) x 113” (D) | - Fixed (stationary) installation: rear of the |
| ( 4114.8mm x 2870.0mm) | system should be at least 30” from the wall. |
| Moveable: 162” (W) x 92” (D) | - Moveable installation: rear of the system |
| ( 4114.8mm x 2336.8mm) | should be at least 10” from the wall and must |
|
| be on mobility plates OR hard surface floor |
|
| AND 4 modules or less. |
Weight | 1,753 lb. (795.1 kg) | With consumables loaded (except media) |
| Additional SFM – 423 lbs. (191.9 kg) |
|
Power and | 208 Volts / 30 Amp sole use, 60 Hz | • UL & cUL compliant |
Agency | Two phase, 3 wire + PE (L1, L2, N, GND) | • Complies with the FEMP (Federal Energy |
Requirements |
| Management Program) via the machine |
North America |
| circuit breaker (CB); with the CB switched |
|
| off, the system consumes less than 1 watt. |
|
| • Energy Star (eStar) compliant |
|
| • Environmental Choice (Canada) |
|
| • Complies with Section 508 of the ADA |
|
| Rehabilitation Act |
Power | • Energy Star (eStar) compliant | |
Requirements | Single phase, 2 wire + PE (L, N, GND) | • Units are compliant with applicable EU |
Europe/Japan |
| directives and are CE marked |
|
|
|
System Configuration and Installation
Installation Preparation Document
This section should be used in conjunction with the Xerox Nuvera™ 100/120 Digital Copier/Printer Installation Planning Guide (IPG) and the Xerox Nuvera™ 100/120 Digital Copier/Printer Installation Preparation Document (IPD), which contain detailed specifications for size, weight, electric, and environmental conditions. Only the most important requirements are stated here.
Customer Responsibilities
The following must be completed before the system can be delivered and will be assessed in the final site check:
Item
Comments
|
| Identify placement of the system |
|
|
|
|
|
|
|
| |
|
| Ensure the printer can be delivered to the site |
|
|
|
|
| Supply the appropriate electrical connections | Dedicated power required |
| |
|
| Install an exhaust duct to vent hot air to the air |
| Heat Vent Kit is available for stationary system |
|
|
| system or the outside if required |
| installations only. The kit lowers the system’s output |
|
|
|
|
| from approximately 17,500 BTU/hour to 8,500 BTU/hr. |
|
|
| Verify the strength and slope of the floor |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
- 8 -