Table 3 describes the yellow, green, and amber light emitting diodes (LEDs) and the activity of the FC 4Gbps 
Table 3. FC 4Gbps 
| Yellow LED | Green LED | Amber LED | Activity | Description | 
| 
 | 
 | 
 | 
 | 
 | 
| Off | Off | Off | Power off | The server adapter is not receiving | 
| 
 | 
 | 
 | 
 | power. The server is powered off. | 
| 
 | 
 | 
 | 
 | 
 | 
| On | On | On | Power on (before | The FC 4Gbps  | 
| 
 | 
 | 
 | firmware initialization) | receiving power from the PCI or | 
| 
 | 
 | 
 | 
 | |
| 
 | 
 | 
 | 
 | the adapter firmware. | 
| 
 | 
 | 
 | 
 | 
 | 
| Flashing | Flashing | Flashing | Power on (after | The FC 4Gbps  | 
| 
 | 
 | 
 | firmware initialization) | successfully initialized by the | 
| 
 | 
 | 
 | 
 | adapter firmware and is in a ready | 
| 
 | 
 | 
 | 
 | state. The adapter firmware is | 
| 
 | 
 | 
 | 
 | initialized when the adapter BIOS | 
| 
 | 
 | 
 | 
 | code is loaded,  | 
| 
 | 
 | 
 | 
 | the operating system driver is | 
| 
 | 
 | 
 | 
 | loaded. | 
| 
 | 
 | 
 | 
 | 
 | 
| Flashing | Flashing | Flashing | Firmware error | The FC 4Gbps  | 
| alternately | alternately | alternately | 
 | firmware has detected an | 
| 
 | 
 | 
 | 
 | unrecoverable error condition. | 
| 
 | 
 | 
 | 
 | 
 | 
| Off | Off | On/Flashing | Online | 1Gbps link / I/O activity | 
| 
 | 
 | 
 | 
 | 
 | 
| Off | On/Flashing | Off | Online | 2Gbps link / I/O activity | 
| 
 | 
 | 
 | 
 | 
 | 
| On/Flashing | Off | Off | Online | 4Gbps link / I/O activity | 
| 
 | 
 | 
 | 
 | 
 | 
| Flashing | Off | Flashing | Beacon | The adapter is responding to a | 
| 
 | 
 | 
 | 
 | Beacon command from an HBA | 
| 
 | 
 | 
 | 
 | management program. | 
| 
 | 
 | 
 | 
 | 
 | 
Chapter 1. Preparing and installing the IBM System Storage DS4000 FC 4Gbps