
Power Up Selftest
Installation and
1.1 Installation
1.1 Installation
Connect the cables to the system box.
5 | 6 | 7 |
K
4 | 3 | 2 | 1 | AC |
Comm 1, Comm 2, | Comm 3 (Serial printer), | Keyboard, | |||
| |||||
Kensington lock socket, |
| Parallel printer, Monitor |
Connect the cables to the monitor.
Check your monitor manual for correct installation.
Push the system box and monitor power switches on. A green light in the switch indicates that power is on.
The terminal takes a few seconds to warm up and complete its power up