Cisco Systems ME 2400 manual Where to Go Next

Page 51

Chapter 2 Switch Installation

Where to Go Next

Step 3 Observe the port status LED.

The LED turns green when the switch and the target device have an established link.

The LED turns amber while the STP discovers the network topology and searches for loops. This process takes about 30 seconds, and then the port LED turns green.

If the LED is off, the target device might not be turned on, there might be a cable problem, or there might be problem with the adapter installed in the target device. See Chapter 3, “Troubleshooting,” for solutions to cabling problems.

Step 4 If necessary, reconfigure and restart the switch or target device.

Where to Go Next

If the default configuration is satisfactory, the switch does not need further configuration. You can use any of these management options to change the default configuration:

Use the CLI from the console to configure the switch. See the switch software configuration guide or the switch command reference on for information about using the CLI with a Cisco ME switch.

For setup instructions that use the CLI setup program, go to Appendix D, “Configuring the Switch with the CLI-Based Setup Program.”

Start an SNMP application such as the CiscoView application.

Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide

 

OL-7678-01

2-25

 

 

 

Image 51
Contents Corporate Headquarters Cisco Systems, Inc. All rights reserved N T E N T S Preparing for Installation Crossover Cable and Adapter Pinouts B-5 OL-7678-01 Audience PurposeOrganization Bewaar Deze Instructies ConventionsSäilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Related PublicationsObtaining Documentation Cisco.comProduct Documentation DVD Documentation Feedback Cisco Product Security OverviewOrdering Documentation Reporting Security Problems in Cisco Products Obtaining Technical AssistanceCisco Technical Support & Documentation Website Definitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information Features Setting up the SwitchFront Panel Description 10/100 Ports Front Panel DescriptionsSFP Modules SFP Module SlotsLEDs SFP Module Patch CableSystem LED Port LEDs Rear Panel DescriptionManagement Options Power ConnectorsCisco ME AC Switch Power Supply Cisco ME DC Switch Power SupplyNetwork Configurations Preparing for Installation Switch InstallationStatement 122F 50C Statement Micron MHz/km Cable Distance Installation GuidelinesGLC-SX-MM Verifying Package Contents Rack-Mounting Verifying Switch OperationInstalling the Switch Powering Off the SwitchRemoving Screws from the Cisco ME Switch Removing Screws from the SwitchRack-Mounting Brackets Attaching Brackets to the SwitchAttaching Brackets to 19-Inch Racks Attaching Brackets for 23-Inch Racks Attaching Brackets to 24-Inch Racks 132665 Attaching Brackets for Etsi Racks 15 Mounting the Cisco ME Switch in a Rack Mounting the Switch in a RackAttaching the Brackets to the Switch for Wall-Mounting Wall-MountingAttaching the Cable Guide 18 Mounting the Switch on a Wall Mounting the Switch on a WallInstalling and Removing SFP Modules Installing SFP Modules into SFP Module SlotsTable- or Shelf- Mounting 19 SFP Module with a Bale-Clasp Latch Removing SFP Modules from SFP Module Slots Inserting and Removing the SFP Module Patch Cable 24 Connecting to an Ethernet Port Connecting to the 10/100 PortsConnecting to Fiber-Optic SFP Modules Connecting to SFP Modules26 Connecting to a 1000BASE-T SFP Module Connecting to 1000BASE-T SFP ModulesWhere to Go Next OL-7678-01 Understanding Post Results Diagnosing ProblemsSymptom Possible Cause Resolution Errdisable recovery cause SFP module might be installed Verify that the SFP module is Technical Specifications OL-7678-01 Connector Specifications Connector and Cable SpecificationsSFP Module Ports Figure B-2 Fiber-Optic SFP Module LC ConnectorTwo Twisted-Pair Cable Pinouts Cable and Adapter SpecificationsTP3 Four Twisted-Pair Cable Pinouts for 1000BASE-T PortsCrossover Cable and Adapter Pinouts Identifying a Crossover CableAdapter Pinouts Switch Console RJ-45-to-DB-25 Port DTE Connecting to DC Power Preparing the Ground Wire Grounding the SwitchTorque to 15 lbf-in Connecting the Grounding Wire to Earth Ground Wiring the DC-Input Power Source Console Figure C-9 Inserting Wires in the Terminal Block Plug Figure C-10 Torquing the Terminal-Block Captive Screws Figure C-12 Inserting the Terminal Block in the Block Header OL-7678-01 Accessing the CLI Through the Console Port Configuring the Switch with the CLI-Based Setup ProgramTaking Out What You Need Cisco ME DC switch DC power cordConnecting to the Console Port Starting the Terminal-Emulation Software Figure D-3 Connecting the Switch to a PCConnecting to a Power Source Entering the Initial Configuration InformationIP Settings Completing the Setup Program These choices appear OL-7678-01 Numerics IN-2 IN-3 IN-4 IN-5 IN-6