Cisco Systems ME 2400 manual Figure C-12 Inserting the Terminal Block in the Block Header

Page 73

Appendix C Connecting to DC Power

Wiring the DC-Input Power Source

Caution Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact. For example, use tie wraps to secure the wires to the rack.

Figure C-12 Inserting the Terminal Block in the Block Header

SYSTEM

+

+

 

A

 

B

 

INPUT

 

 

 

-36

-72 V

CURRENT

 

 

2 – 1A

CONSOLE

132851

Step 9 Remove the tape from the circuit-breaker switch handle, and move the circuit-breaker handle to the on position.

Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide

 

OL-7678-01

C-9

 

Image 73
Contents Corporate Headquarters Cisco Systems, Inc. All rights reserved N T E N T S Preparing for Installation Crossover Cable and Adapter Pinouts B-5 OL-7678-01 Purpose AudienceOrganization Bewaar Deze Instructies ConventionsSäilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Related PublicationsCisco.com Obtaining DocumentationProduct Documentation DVD Cisco Product Security Overview Documentation FeedbackOrdering Documentation Obtaining Technical Assistance Reporting Security Problems in Cisco ProductsCisco Technical Support & Documentation Website Definitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information Features Setting up the SwitchFront Panel Description 10/100 Ports Front Panel DescriptionsSFP Modules SFP Module SlotsSFP Module Patch Cable LEDsSystem LED Port LEDs Rear Panel DescriptionCisco ME AC Switch Power Supply Power ConnectorsCisco ME DC Switch Power Supply Management OptionsNetwork Configurations Preparing for Installation Switch InstallationStatement 122F 50C Statement Micron MHz/km Cable Distance Installation GuidelinesGLC-SX-MM Verifying Package Contents Installing the Switch Verifying Switch OperationPowering Off the Switch Rack-MountingRemoving Screws from the Cisco ME Switch Removing Screws from the SwitchRack-Mounting Brackets Attaching Brackets to the SwitchAttaching Brackets to 19-Inch Racks Attaching Brackets for 23-Inch Racks Attaching Brackets to 24-Inch Racks 132665 Attaching Brackets for Etsi Racks 15 Mounting the Cisco ME Switch in a Rack Mounting the Switch in a RackWall-Mounting Attaching the Brackets to the Switch for Wall-MountingAttaching the Cable Guide 18 Mounting the Switch on a Wall Mounting the Switch on a WallInstalling SFP Modules into SFP Module Slots Installing and Removing SFP ModulesTable- or Shelf- Mounting 19 SFP Module with a Bale-Clasp Latch Removing SFP Modules from SFP Module Slots Inserting and Removing the SFP Module Patch Cable 24 Connecting to an Ethernet Port Connecting to the 10/100 PortsConnecting to Fiber-Optic SFP Modules Connecting to SFP Modules26 Connecting to a 1000BASE-T SFP Module Connecting to 1000BASE-T SFP ModulesWhere to Go Next OL-7678-01 Understanding Post Results Diagnosing ProblemsSymptom Possible Cause Resolution Errdisable recovery cause SFP module might be installed Verify that the SFP module is Technical Specifications OL-7678-01 Connector Specifications Connector and Cable SpecificationsSFP Module Ports Figure B-2 Fiber-Optic SFP Module LC ConnectorTwo Twisted-Pair Cable Pinouts Cable and Adapter SpecificationsTP3 Four Twisted-Pair Cable Pinouts for 1000BASE-T PortsIdentifying a Crossover Cable Crossover Cable and Adapter PinoutsAdapter Pinouts Switch Console RJ-45-to-DB-25 Port DTE Connecting to DC Power Preparing the Ground Wire Grounding the SwitchTorque to 15 lbf-in Connecting the Grounding Wire to Earth Ground Wiring the DC-Input Power Source Console Figure C-9 Inserting Wires in the Terminal Block Plug Figure C-10 Torquing the Terminal-Block Captive Screws Figure C-12 Inserting the Terminal Block in the Block Header OL-7678-01 Accessing the CLI Through the Console Port Configuring the Switch with the CLI-Based Setup ProgramTaking Out What You Need Cisco ME DC switch DC power cordConnecting to the Console Port Starting the Terminal-Emulation Software Figure D-3 Connecting the Switch to a PCEntering the Initial Configuration Information Connecting to a Power SourceIP Settings Completing the Setup Program These choices appear OL-7678-01 Numerics IN-2 IN-3 IN-4 IN-5 IN-6