Cisco Systems OL-6157-01 manual Chapter

Page 32

Chapter 2

Installation

Preparing for Installation

Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 48

Warning The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device. Statement 1019

Warning To prevent the switch from overheating, do not operate it in an area that exceeds the maximum recommended ambient temperature of 113°F (45°C). To prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around the ventilation openings. Statement 17B

Warning When installing the unit, always make the ground connection first and disconnect it last. Statement 42

Warning Installation of the equipment must comply with local and national electrical codes. Statement 1074

Warning This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use. Statement 39

Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43

Warning Do not work on the system or connect or disconnect cables during periods of lightning activity. Statement 1001

Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040

Warning Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments. Statement 1051

Warning Class 1 laser product. Statement 1008

Warning Avoid direct exposure to the laser beam. Statement 1012

Catalyst 2940 Switch Hardware Installation Guide

2-2

OL-6157-01

 

 

Image 32
Contents Catalyst 2940 Switch Hardware Installation Guide Corporate HeadquartersCatalyst 2940 Switch Hardware Installation Guide N T E N T S Installation Accessing the CLI Through the Console Port D-2 Contents Catalyst 2940 Hardware Installation Guide Conventions AudiencePurpose Bewaar Deze Instructies Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Aviso Instruções Importantes DE SegurançaOL-6157-01 GEM Disse Anvisninger Xii Related Publications Obtaining Documentation Cisco.comDocumentation CD-ROM Ordering DocumentationCisco TAC Website Opening a TAC Case Obtaining Technical AssistanceDocumentation Feedback Obtaining Additional Publications and Information TAC Case Priority DefinitionsXvii Xviii Setting up the Switch FeaturesFront-Panel Description 10/100 Ethernet ports 100BASE-FX port SFP module slotPort Numbering 10/100 Ports10/100/1000 Port Port or Slot type Catalyst 2940-8TT-S Catalyst 2940-8TF-SType Cisco Part Number 100BASE-FX PortSFP Module Slot 62.5/125 micron 50/125 micron Micron Single-mode SFP ModulesMicron Cable Guard LEDsMode LED Port Mode Description Color System StatusPort Mode Color Meaning Power Connector Rear-Panel DescriptionConsole Port Security SlotsManagement Options OL-6157-01 Installation Preparing for InstallationChapter Installation Guidelines Verifying Package ContentsVerifying Switch Operation Installing the Switch on a Desk With Mounting Screws Installing the SwitchInstalling the Switch on a Desk Without Mounting Screws Installing the Mounting Screws on Top of a Desk Installing the Switch Under a Desk Mounting the Switch on Top of a DeskInstalling the Mounting Screws Under a Desk Installing the Switch on a Wall Mounting the Switch Under a DeskThis Side Switch Screw Slides on this way Connecting to an SFP Module Installing the Switch Magnet MountConnecting to an SFP Module Port Connecting to 10/100 Ports and the 10/100/1000 Port Connecting to a 10/100 PortConnecting to the 100BASE-FX Port 10 Connecting to a 100BASE-FX Port11 Connecting to an SFP Module Port Where to Go Next Chapter Diagnosing Common Problems Understanding Post ResultsSymptom Possible Cause Resolution B-5 throughNo connectivity to SFP Poor performance or excessive System LED is amber OL-6157-01 Environmental Ranges Power RequirementsPhysical Dimensions SFP module Fiber-Port Power Levels 100BASE-FX port Slot1Safety Table A-3 Catalyst 2940 Switch Agency Approvals OL-6157-01 Connectors and Cables Connector SpecificationsFigure B-2 10/100 RJ-45 Pinouts Connecting to 10BASE-T and 100BASE-TX Devices 10/100/1000 PortsFigure B-4 MT-RJ Connector Cable and Adapter Specifications Two Twisted-Pair Cable PinoutsFour Twisted-Pair Cable Pinouts for 10/100 Ports TD+Four Twisted-Pair Cable Pinouts for 1000BASE-T Ports TPOConnecting to a PC Cable and Adapter PinoutsIdentifying a Rollover Cable OL-6157-01 Configuring the Switch with the CLI-Based Setup Program Methods for Accessing the CLIAccessing the CLI Through the Console Port Taking Out What You NeedConnecting to a Power Source Connecting to the Console PortFigure C-3 Connecting a Switch to a PC Starting the Terminal Emulation SoftwareEntering the Initial Configuration Information IP SettingsCompleting the Setup Program These choices appear CLI Numerics IN-2 IN-3 IN-4 IN-5 IN-6